Causas universais dos excedentes de prazo em projetos de construção

The satisfactory performance of a project is subject to a number of factors, including its execution on schedule. However, time overruns are frequent and have an impact on costs, the environment and society. This article aims to identify the main causes of delays in construction projects reported in the literature from different countries. The methodology adopted was a systematic literature review, extraction and statistical analysis of the causes indicated in articles over a 5-year period, in order to draw up a ranking of universal causes of delay in construction projects. A total of 68 studies were selected and 321 causes were obtained, from which the ranking of the 20 universal causes of delay was drawn up, the main ones being late payments to the contractor and frequent requests for changes/alterations to the project. From the study, it was possible to produce systematized knowledge about time overruns in projects to be applied in strategies to mitigate this problem. Identifying the causes of delays highlights issues to be prioritized, avoiding project stoppages and losses in essential investments for the economic and social development of countries.

Authors

Institutions

Publication Details

Journal
Periódico Técnico e Científico Cidades Verdes
Published
2024-08-30
DOI
https://doi.org/10.17271/23178604123720245428
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Causas universais dos excedentes de prazo em projetos de construção

Emília Rahnemay Kohlman Rabbani, Maria Conceição da Costa Silva, Newton Narciso Pereira
Periódico Técnico e Científico Cidades Verdes
Construction Project Management and Performance
article

Causas universais dos excedentes de prazo em projetos de construção

Emília Rahnemay Kohlman Rabbani, Maria Conceição da Costa Silva, Newton Narciso Pereira
article en

Abstract

The satisfactory performance of a project is subject to a number of factors, including its execution on schedule. However, time overruns are frequent and have an impact on costs, the environment and society. This article aims to identify the main causes of delays in construction projects reported in the literature from different countries. The methodology adopted was a systematic literature review, extraction and statistical analysis of the causes indicated in articles over a 5-year period, in order to draw up a ranking of universal causes of delay in construction projects. A total of 68 studies were selected and 321 causes were obtained, from which the ranking of the 20 universal causes of delay was drawn up, the main ones being late payments to the contractor and frequent requests for changes/alterations to the project. From the study, it was possible to produce systematized knowledge about time overruns in projects to be applied in strategies to mitigate this problem. Identifying the causes of delays highlights issues to be prioritized, avoiding project stoppages and losses in essential investments for the economic and social development of countries.

Periódico Técnico e Científico Cidades VerdesVol. 12(37)
Corporación Universitaria Minuto de Dios (CO), Centro Universitário Paulistano (BR)
Openalex Percentile: Top 69%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.