Scheduling and Resource Management in Sustainable Construction Projects

Construction shapes our world but is taking a heavy toll on our planet. From our energy consumption to carbon emissions, how we build today affects the world in the future. As energy bills rise and our planet deteriorates, builders and developers are rethinking their approach. By embracing greener materials and sustainable construction, they are finding ways to have a lighter carbon footprint. Careful planning and effective resource management are the keys to making this work. These early decisions ripple through the entire project, ultimately determining whether we succeed in building for today and for future generations. This study explores the significance of strategic scheduling and resource optimization in environmentally friendly construction projects. Its objectives include examining how scheduling methods affect the incorporation and efficacy of green materials and energy-efficient technologies, assessing resource management approaches to minimize delays and budget overruns, and creating a framework that balances sustainability objectives with traditional construction limitations while maximizing long-term investment returns. The research data was gathered through case studies, structured interviews with industry experts, and an examination of life cycle assessments. The results underscore the necessity of incorporating sustainability considerations into project timelines and resource allocation strategies. This research offers practical insights for construction managers and policymakers, emphasizing how efficient scheduling and resource management can drive environmental and financial advantages in sustainable construction projects. Keywords : Resource Management, Sustainable Construction Projects DOI : 10.7176/EJBM/16-9-12 Publication date : November 30th 2024

Institutions

Publication Details

Journal
European Journal of Business and Management
Published
2024-12-01
DOI
https://doi.org/10.7176/ejbm/16-9-12
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Scheduling and Resource Management in Sustainable Construction Projects

European Journal of Business and Management
BIM and Construction Integration
article

Scheduling and Resource Management in Sustainable Construction Projects

article en

Abstract

Construction shapes our world but is taking a heavy toll on our planet. From our energy consumption to carbon emissions, how we build today affects the world in the future. As energy bills rise and our planet deteriorates, builders and developers are rethinking their approach. By embracing greener materials and sustainable construction, they are finding ways to have a lighter carbon footprint. Careful planning and effective resource management are the keys to making this work. These early decisions ripple through the entire project, ultimately determining whether we succeed in building for today and for future generations. This study explores the significance of strategic scheduling and resource optimization in environmentally friendly construction projects. Its objectives include examining how scheduling methods affect the incorporation and efficacy of green materials and energy-efficient technologies, assessing resource management approaches to minimize delays and budget overruns, and creating a framework that balances sustainability objectives with traditional construction limitations while maximizing long-term investment returns. The research data was gathered through case studies, structured interviews with industry experts, and an examination of life cycle assessments. The results underscore the necessity of incorporating sustainability considerations into project timelines and resource allocation strategies. This research offers practical insights for construction managers and policymakers, emphasizing how efficient scheduling and resource management can drive environmental and financial advantages in sustainable construction projects. Keywords : Resource Management, Sustainable Construction Projects DOI : 10.7176/EJBM/16-9-12 Publication date : November 30th 2024

European Journal of Business and Management
Missouri State University (US)
Responsible consumption and production
Openalex Percentile: Top 73%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Scheduling and Resource Management in Sustainable Construction Projects · European Journal of Business and Management (2024) | TGRS Research Map | TGRS