Optimization of Flat Construction Implementation Time Using Critical Path Method and Project Evaluation and Review Technique

This research aims to develop a system that effectively solves construction project management problems using PERT (Project Evaluation and Review Technique) and CPM (Critical Path Method) methods for the ASN flat construction project in Piru City, Maluku Province, Indonesia. In this study, the project activity data was analyzed using the PERT Method, which includes realistic, optimistic, and pessimistic durations; then, it is used to calculate the estimated time of each activity. Meanwhile, CPM was used to determine the critical path of the project. The results showed that project management can be done more accurately and efficiently with these two methods, minimizing the risk of delays. The optimal duration of the project obtained is 49 weeks with a probability value of 98.87% with the critical path obtained, namely A-B-E-F-G-J-K-L-M.

Authors

Institutions

Publication Details

Journal
Pattimura International Journal of Mathematics (PIJMath)
Published
2024-11-30
DOI
https://doi.org/10.30598/pijmathvol3iss2pp39-50
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Flat Construction Implementation Time Using Critical Path Method and Project Evaluation and Review Technique

Venn Yan Ishak Ilwaru, Yopi Andry Lesnussa, Adis Harni Tuanaya
1 citations
Pattimura International Journal of Mathematics (PIJMath)
BIM and Construction Integration
0.27
article

Optimization of Flat Construction Implementation Time Using Critical Path Method and Project Evaluation and Review Technique

Venn Yan Ishak Ilwaru, Yopi Andry Lesnussa, Adis Harni Tuanaya
article en
1 citations

Abstract

This research aims to develop a system that effectively solves construction project management problems using PERT (Project Evaluation and Review Technique) and CPM (Critical Path Method) methods for the ASN flat construction project in Piru City, Maluku Province, Indonesia. In this study, the project activity data was analyzed using the PERT Method, which includes realistic, optimistic, and pessimistic durations; then, it is used to calculate the estimated time of each activity. Meanwhile, CPM was used to determine the critical path of the project. The results showed that project management can be done more accurately and efficiently with these two methods, minimizing the risk of delays. The optimal duration of the project obtained is 49 weeks with a probability value of 98.87% with the critical path obtained, namely A-B-E-F-G-J-K-L-M.

Pattimura International Journal of Mathematics (PIJMath)Vol. 3(2)
University of Pattimura (ID)
Sustainable cities and communities
Openalex Percentile: Top 40%
BIM and Construction Integration
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimization of Flat Construction Implementation Time Using Critical Path Method and Project Evaluation and Review Technique — Venn Yan Ishak Ilwaru, Yopi Andry Lesnussa, et al. · Pattimura International Journal of Mathematics (PIJMath) (2024) | TGRS Research Map | TGRS