Identification and Elimination of Waste Activities in The Gray Yarn Processing Company

This study aims to identify the types of waste and recommend improvements to minimize waste that occurs in the gray yarn processing company. Value Stream Mapping (VSM) is used to analyze the flow of materials and information throughout the production process. The main objective is to identify and eliminate waste, thereby improving efficiency and productivity in manufacturing operations. The biggest types of waste in the grey yarn processing production process of the preparation department are Unnecessary motion and Overprocessing waste types at 30% each, Unnecessary Inventory at 20%, and transportation at 20%. The recommendations given can reduce the overall leadtime from 58967 seconds to 58771 seconds.

Authors

Institutions

Publication Details

Journal
Journal of Industrial Engineering and Halal Industries
Published
2024-12-31
DOI
https://doi.org/10.14421/jiehis.4913
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Identification and Elimination of Waste Activities in The Gray Yarn Processing Company

Erlangga Fausa, Dhinar Elma Arifa, Imam Djati Widodo
Journal of Industrial Engineering and Halal Industries
Quality and Supply Management
article

Identification and Elimination of Waste Activities in The Gray Yarn Processing Company

Erlangga Fausa, Dhinar Elma Arifa, Imam Djati Widodo
article en

Abstract

This study aims to identify the types of waste and recommend improvements to minimize waste that occurs in the gray yarn processing company. Value Stream Mapping (VSM) is used to analyze the flow of materials and information throughout the production process. The main objective is to identify and eliminate waste, thereby improving efficiency and productivity in manufacturing operations. The biggest types of waste in the grey yarn processing production process of the preparation department are Unnecessary motion and Overprocessing waste types at 30% each, Unnecessary Inventory at 20%, and transportation at 20%. The recommendations given can reduce the overall leadtime from 58967 seconds to 58771 seconds.

Journal of Industrial Engineering and Halal IndustriesVol. 5(2)
Islamic University of Indonesia (ID)
Openalex Percentile: Top 60%
Quality and Supply Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.