BIM CONTROL METHOD FOR HIDDEN QUALITY COST OF PREFABRICATED BUILDING CONSTRUCTION PROJECT

At present, the hidden quality cost in the construction process of prefabricated building projects in China is too high. If it is not controlled, there will inevitably be a "benefit funnel". Based on the construction of cost BIM control model, the information integration platform of prefabricated construction project is designed. Utilizing the details provided regarding the model and platform, the technique of constrained machine learning is employed for managing the concealed expenses related to quality in prefabricated construction ventures. By optimizing cost control, the ultimate objective of managing expenses is achieved. The outcomes of experiments illustrate that this approach has the capability to proficiently govern the covert quality expenses linked with prefabricated construction projects. It significantly enhances the focused and efficient management of comprehensive and evolving oversight of quality-related expenses throughout the construction process.

Authors

Institutions

Publication Details

Journal
Stavební obzor
Published
2024-10-31
DOI
https://doi.org/10.14311/cej.2024.03.0021
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

BIM CONTROL METHOD FOR HIDDEN QUALITY COST OF PREFABRICATED BUILDING CONSTRUCTION PROJECT

Heng Zhao, Zhana Ningning
Stavební obzor
BIM and Construction Integration
article

BIM CONTROL METHOD FOR HIDDEN QUALITY COST OF PREFABRICATED BUILDING CONSTRUCTION PROJECT

Heng Zhao, Zhana Ningning
article en

Abstract

At present, the hidden quality cost in the construction process of prefabricated building projects in China is too high. If it is not controlled, there will inevitably be a "benefit funnel". Based on the construction of cost BIM control model, the information integration platform of prefabricated construction project is designed. Utilizing the details provided regarding the model and platform, the technique of constrained machine learning is employed for managing the concealed expenses related to quality in prefabricated construction ventures. By optimizing cost control, the ultimate objective of managing expenses is achieved. The outcomes of experiments illustrate that this approach has the capability to proficiently govern the covert quality expenses linked with prefabricated construction projects. It significantly enhances the focused and efficient management of comprehensive and evolving oversight of quality-related expenses throughout the construction process.

Stavební obzorVol. 33(3)
Neijiang Normal University (CN)
Industry, innovation and infrastructure
Openalex Percentile: Top 73%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

BIM CONTROL METHOD FOR HIDDEN QUALITY COST OF PREFABRICATED BUILDING CONSTRUCTION PROJECT — Heng Zhao, Zhana Ningning · Stavební obzor (2024) | TGRS Research Map | TGRS