PREVENTION AND DRAINAGE TECHNOLOGY FOR ANTI-STUCK AND DISCHARGING DURING SHIELD TUNNELING IN COMPLEX RED ROCK STRATA WITH ULTRA-LARGE DIAMETER UNDER NORMAL AND PRESSURIZED CONDITIONS

During the construction process of shield tunneling with ultra-large diameter under normal and pressurized conditions, problems such as mud cake formation on the cutterhead, stagnation of mud in the chamber, blockage of slurry discharge chute, high cutterhead torque, and slow excavation speed are prone to occur. In severe cases, these issues can impact construction progress and pose a threat to construction safety. Taking the Guangzhou Haizhu Bay Tunnel project as a case study, this paper proposes prevention and drainage technology for anti-stuck and discharging during shield tunneling in complex red rock strata with ultra-large diameter under normal and pressurized conditions, focusing on mud slurry control, optimization of cutterhead flushing system, excavation parameter control, and cutter tool optimization.

Authors

Publication Details

Journal
Stavební obzor
Published
2024-10-31
DOI
https://doi.org/10.14311/cej.2024.03.0027
Citations
2
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.52
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PREVENTION AND DRAINAGE TECHNOLOGY FOR ANTI-STUCK AND DISCHARGING DURING SHIELD TUNNELING IN COMPLEX RED ROCK STRATA WITH ULTRA-LARGE DIAMETER UNDER NORMAL AND PRESSURIZED CONDITIONS

Xingwei Xue, Dawei Hu, Jian Ouyang, Xin Dong et al.
2 citations
Stavební obzor
Tunneling and Rock Mechanics
0.52
article

PREVENTION AND DRAINAGE TECHNOLOGY FOR ANTI-STUCK AND DISCHARGING DURING SHIELD TUNNELING IN COMPLEX RED ROCK STRATA WITH ULTRA-LARGE DIAMETER UNDER NORMAL AND PRESSURIZED CONDITIONS

Xingwei Xue, Dawei Hu, Jian Ouyang, Xin Dong, Kexin Zhang, Qingcheng Zeng
article en
2 citations

Abstract

During the construction process of shield tunneling with ultra-large diameter under normal and pressurized conditions, problems such as mud cake formation on the cutterhead, stagnation of mud in the chamber, blockage of slurry discharge chute, high cutterhead torque, and slow excavation speed are prone to occur. In severe cases, these issues can impact construction progress and pose a threat to construction safety. Taking the Guangzhou Haizhu Bay Tunnel project as a case study, this paper proposes prevention and drainage technology for anti-stuck and discharging during shield tunneling in complex red rock strata with ultra-large diameter under normal and pressurized conditions, focusing on mud slurry control, optimization of cutterhead flushing system, excavation parameter control, and cutter tool optimization.

Stavební obzorVol. 33(3)
Sustainable cities and communities
Openalex Percentile: Top 34%
Tunneling and Rock Mechanics
0.52
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.