APPLICATION OF L-SHAPED MAST CLIMBING WORK PLATFORM(MCWP) IN FAÇADE RENOVATION OF HIGH-RISE BUILDINGS: A CASE STUDY

A typical mast climbing work platform (MCWP) is introduced in this paper as a new type of construction machinery for façade renovation of high-rise buildings. The application of the MCWP is presented based on a real facade renovation project where a combined arrangement of linear and L-shaped MCWP is adopted. The FEM model of an L-shaped MCWP is also established in this paper and the results are obtained. It is indicated from the results that the serviceability of L-shaped meets the requirements of the standard. Based on the duration and cost of a control group, the MCWP method can greatly improve construction efficiency and reduce cost compared with a suspended basket method.

Authors

Institutions

Publication Details

Journal
Stavební obzor
Published
2024-10-31
DOI
https://doi.org/10.14311/cej.2024.03.0024
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

APPLICATION OF L-SHAPED MAST CLIMBING WORK PLATFORM(MCWP) IN FAÇADE RENOVATION OF HIGH-RISE BUILDINGS: A CASE STUDY

Yuchao Zhang, Ni Yin, Fuli Li
Stavební obzor
Advanced Manufacturing and Logistics Optimization
article

APPLICATION OF L-SHAPED MAST CLIMBING WORK PLATFORM(MCWP) IN FAÇADE RENOVATION OF HIGH-RISE BUILDINGS: A CASE STUDY

Yuchao Zhang, Ni Yin, Fuli Li
article en

Abstract

A typical mast climbing work platform (MCWP) is introduced in this paper as a new type of construction machinery for façade renovation of high-rise buildings. The application of the MCWP is presented based on a real facade renovation project where a combined arrangement of linear and L-shaped MCWP is adopted. The FEM model of an L-shaped MCWP is also established in this paper and the results are obtained. It is indicated from the results that the serviceability of L-shaped meets the requirements of the standard. Based on the duration and cost of a control group, the MCWP method can greatly improve construction efficiency and reduce cost compared with a suspended basket method.

Stavební obzorVol. 33(3)
Shanghai University (CN), Shanghai Construction Group (China) (CN)
Sustainable cities and communities
Openalex Percentile: Top 63%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.