Development and Application of Subdivision Water Injection Technology in Gudong Oil Production Plant

The conventional eccentric water injection string is generally used in multi-stage separate injection wells, and the equal pressure drop test method is adopted, and the water volume calculation method is adopted, and the average test period of a single well is 8 days. With the concept of reliability design, the working reliability of separate injection string was strengthened, and the measures of separate injection, subdivision injection, interval recombination and pipe inspection and redistribution were implemented on site. The average number of separate injection layers per single well in sandstone reservoir increased from 2.9 to 3.5, and the average number of separate injection layers per single well in main sandstone reservoir increased steadily from 3.0 to 3.8. At the same time, the linkage technology of bridge eccentric separate injection and measurement and adjustment is gradually popularized, and the average test period of single well is shortened from 8 days to 2 days.

Authors

Institutions

Publication Details

Journal
Scientific Research Bulletin
Published
2024-09-15
DOI
https://doi.org/10.71052/srb2024/bdkf5497
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development and Application of Subdivision Water Injection Technology in Gudong Oil Production Plant

Yuanpeng Zhang
Scientific Research Bulletin
Oil and Gas Production Techniques
article

Development and Application of Subdivision Water Injection Technology in Gudong Oil Production Plant

Yuanpeng Zhang
article en

Abstract

The conventional eccentric water injection string is generally used in multi-stage separate injection wells, and the equal pressure drop test method is adopted, and the water volume calculation method is adopted, and the average test period of a single well is 8 days. With the concept of reliability design, the working reliability of separate injection string was strengthened, and the measures of separate injection, subdivision injection, interval recombination and pipe inspection and redistribution were implemented on site. The average number of separate injection layers per single well in sandstone reservoir increased from 2.9 to 3.5, and the average number of separate injection layers per single well in main sandstone reservoir increased steadily from 3.0 to 3.8. At the same time, the linkage technology of bridge eccentric separate injection and measurement and adjustment is gradually popularized, and the average test period of single well is shortened from 8 days to 2 days.

Scientific Research BulletinVol. 1(5)
Shengli Oilfield Central Hospital (CN)
Clean water and sanitation
Openalex Percentile: Top 67%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.