Perencanaan Penjadwalan Perawatan Alat Berat Mobile Crane Menggunakan Metode CPM (Studi Kasus : PT. Menara Riau Perkasa)

PT Menara Riau Perkasa is a company engaged in the rental of heavy equipment. The maintenance process unscheduled mobile crane heavy equipment is quite long within 5 days including overtime and rest hours and 1 day is inspection. Ordering heavy equipment for 6 days so that the company is often in a hurry for the maintenance process. Therefore, optimization of mobile crane maintenance is carried out by measuring the duration of each maintenance process using the Critical Path Method (CPM). This method is used to identify tasks needed in completing the project and determine scheduling flexibility. This method can complete the maintenance process with an effective time of 2.8 days with 8 hours of operation without rest hours and inspection for 1 day so that the total completion is 3.8 days. The use of the CPM method can reduce the maintenance process time because there are 2 main maintenance process activities that can be done at once with limited leeway time for the battery water process and hydraulic repairs.

Authors

Institutions

Publication Details

Journal
Jurnal Surya Teknika
Published
2024-12-31
DOI
https://doi.org/10.37859/jst.v11i2.8262
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Perencanaan Penjadwalan Perawatan Alat Berat Mobile Crane Menggunakan Metode CPM (Studi Kasus : PT. Menara Riau Perkasa)

Muhammad Qurthuby, Faradila Ananda Yul, Dedi Dermawan, Rozar Rayendra et al.
Jurnal Surya Teknika
Management and Optimization Techniques
article

Perencanaan Penjadwalan Perawatan Alat Berat Mobile Crane Menggunakan Metode CPM (Studi Kasus : PT. Menara Riau Perkasa)

Muhammad Qurthuby, Faradila Ananda Yul, Dedi Dermawan, Rozar Rayendra, Viona Aulia Rahmi, Indria Olyvhia Sinatra
article en

Abstract

PT Menara Riau Perkasa is a company engaged in the rental of heavy equipment. The maintenance process unscheduled mobile crane heavy equipment is quite long within 5 days including overtime and rest hours and 1 day is inspection. Ordering heavy equipment for 6 days so that the company is often in a hurry for the maintenance process. Therefore, optimization of mobile crane maintenance is carried out by measuring the duration of each maintenance process using the Critical Path Method (CPM). This method is used to identify tasks needed in completing the project and determine scheduling flexibility. This method can complete the maintenance process with an effective time of 2.8 days with 8 hours of operation without rest hours and inspection for 1 day so that the total completion is 3.8 days. The use of the CPM method can reduce the maintenance process time because there are 2 main maintenance process activities that can be done at once with limited leeway time for the battery water process and hydraulic repairs.

Jurnal Surya TeknikaVol. 11(2)
Universitas Muhammadiyah Riau (ID)
Clean water and sanitation
Openalex Percentile: Top 57%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Perencanaan Penjadwalan Perawatan Alat Berat Mobile Crane Menggunakan Metode CPM (Studi Kasus : PT. Menara Riau Perkasa) — Muhammad Qurthuby, Faradila Ananda Yul, et al. · Jurnal Surya Teknika (2024) | TGRS Research Map | TGRS