Perencanaan Produksi Guna Mengatasi Overstock Produk Jadi pada CV PCP

CV PCP is a manufacturing company that manufactures road construction products. This company produces various types of road construction products, namely rectangular paving blocks, hexagonal paving blocks, 3D paving blocks, curbs, U-Ditch, and kerbstones. At CV PCP, the production planning and inventory control processes are less than optimal, resulting in overstock in the finished goods warehouse. The overstock problem causes storage to exceed warehouse capacity, products to be damaged due to excessive accumulation, and transportation access to be disrupted. This research addresses the overstock of finished goods in the warehouse caused by these factors. The Run Out Time (ROT) method determines the optimal production schedule by considering the production sequence based on the inventory depletion time. From the production planning using the Run Out Time (ROT) method, the average production result over 6 months before ROT was 156,600 pcs, and after the implementation of ROT, the result was 107,136 pcs. With the decrease in production output, the quantity of product stock also experienced a decline. The average product stock before the implementation of ROT was 386,681 pcs. After the implementation of ROT, it was 299,629 pcs, so the product stock did not exceed the maximum warehouse capacity of 345,000 pcs. Because overstock in the warehouse is minimized, the risk of product damage can also be minimized, which affects storage costs that decreased from an average of Rp. 81,216,828 before the implementation of ROT to Rp. 75,613,317 after the implementation of ROT. As a result, the company can also minimize the storage costs of finished products.

Authors

Institutions

Publication Details

Journal
Jurnal Surya Teknika
Published
2024-12-31
DOI
https://doi.org/10.37859/jst.v11i2.8191
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Perencanaan Produksi Guna Mengatasi Overstock Produk Jadi pada CV PCP

Awanda Firdaus Muswati, Siti Mundari
Jurnal Surya Teknika
Management and Optimization Techniques
article

Perencanaan Produksi Guna Mengatasi Overstock Produk Jadi pada CV PCP

Awanda Firdaus Muswati, Siti Mundari
article en

Abstract

CV PCP is a manufacturing company that manufactures road construction products. This company produces various types of road construction products, namely rectangular paving blocks, hexagonal paving blocks, 3D paving blocks, curbs, U-Ditch, and kerbstones. At CV PCP, the production planning and inventory control processes are less than optimal, resulting in overstock in the finished goods warehouse. The overstock problem causes storage to exceed warehouse capacity, products to be damaged due to excessive accumulation, and transportation access to be disrupted. This research addresses the overstock of finished goods in the warehouse caused by these factors. The Run Out Time (ROT) method determines the optimal production schedule by considering the production sequence based on the inventory depletion time. From the production planning using the Run Out Time (ROT) method, the average production result over 6 months before ROT was 156,600 pcs, and after the implementation of ROT, the result was 107,136 pcs. With the decrease in production output, the quantity of product stock also experienced a decline. The average product stock before the implementation of ROT was 386,681 pcs. After the implementation of ROT, it was 299,629 pcs, so the product stock did not exceed the maximum warehouse capacity of 345,000 pcs. Because overstock in the warehouse is minimized, the risk of product damage can also be minimized, which affects storage costs that decreased from an average of Rp. 81,216,828 before the implementation of ROT to Rp. 75,613,317 after the implementation of ROT. As a result, the company can also minimize the storage costs of finished products.

Jurnal Surya TeknikaVol. 11(2)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 57%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.