Evaluation of Toll Rates with the Ability to Pay and Willingness to Pay Approach to Implementation on the Trans Sumatra Toll Road Pekanbaru Dumai Section

The Pekanbaru-Dumai Trans Sumatra Toll Road project is an economically feasible project but not financially feasible. This study aims to assess the feasibility of toll roads that have low financial viability. Data analysis involves the relationship between the ability to pay (ATP) and willingness to pay (WTP), as well as financial evaluation using FIRR, NPV, and Payback Period. The results of the study show that the Trans Sumatra toll road Pekanbaru Dumai section needs a financial evaluation. The evaluation showed an average ability to pay (ATP) of IDR 237,461.00 and an average willingness to pay (WTP) of IDR 146,046.00. The research found that the optimal rate is IDR 115,500.00 that users can accept. The Financial Internal Rate of Return (FIRR) of the project based on ATP and WTP rates is 8.97%, indicating a relatively low rate of return compared to the Business Plan. Innovative strategies in operational management, including service efficiency and revenue diversification, can improve financial performance and ensure long-term investment continuity.

Authors

Publication Details

Journal
International Journal of Current Science Research and Review
Published
2024-12-31
DOI
https://doi.org/10.47191/ijcsrr/v7-i12-80
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of Toll Rates with the Ability to Pay and Willingness to Pay Approach to Implementation on the Trans Sumatra Toll Road Pekanbaru Dumai Section

Eka Pria Anas, Novian Anugerata
International Journal of Current Science Research and Review
Urban Transport Systems Analysis
article

Evaluation of Toll Rates with the Ability to Pay and Willingness to Pay Approach to Implementation on the Trans Sumatra Toll Road Pekanbaru Dumai Section

Eka Pria Anas, Novian Anugerata
article en

Abstract

The Pekanbaru-Dumai Trans Sumatra Toll Road project is an economically feasible project but not financially feasible. This study aims to assess the feasibility of toll roads that have low financial viability. Data analysis involves the relationship between the ability to pay (ATP) and willingness to pay (WTP), as well as financial evaluation using FIRR, NPV, and Payback Period. The results of the study show that the Trans Sumatra toll road Pekanbaru Dumai section needs a financial evaluation. The evaluation showed an average ability to pay (ATP) of IDR 237,461.00 and an average willingness to pay (WTP) of IDR 146,046.00. The research found that the optimal rate is IDR 115,500.00 that users can accept. The Financial Internal Rate of Return (FIRR) of the project based on ATP and WTP rates is 8.97%, indicating a relatively low rate of return compared to the Business Plan. Innovative strategies in operational management, including service efficiency and revenue diversification, can improve financial performance and ensure long-term investment continuity.

International Journal of Current Science Research and ReviewVol. 07(12)
Industry, innovation and infrastructure
Openalex Percentile: Top 72%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluation of Toll Rates with the Ability to Pay and Willingness to Pay Approach to Implementation on the Trans Sumatra Toll Road Pekanbaru Dumai Section — Eka Pria Anas, Novian Anugerata · International Journal of Current Science Research and Review (2024) | TGRS Research Map | TGRS