ANALISIS PENYEBAB KETERLAMBATAN PEKERJAAN REPLATING LAMBUNG PADA PROYEK KAPAL X MENGGUNAKAN METODE FAULT TREE ANALYSIS

The The success of a project is marked by the achievement of the planned target. However, in its implementation, delays often occur, including in the hull replating work. In the ship repair project X at PT XYZ, this work experienced a schedule delay due to constraints on materials/equipment, labor, and management. The purpose of this study was to determine the root cause of the delay and propose improvements. The analysis was carried out using the Fault Tree Analysis (FTA) method to identify the root cause of the delay, while the improvement proposal was carried out using the Kaizen 5S method (Seiri, Seiton, Seiso, Seiketsu, Shitsuke). Based on the results of the analysis using the FTA method, the main factor causing the delay was the material/equipment factor with a probability value of 0.304. This factor includes three main indicators of the cause of the delay, namely the delay in the arrival of materials, the ordered materials are not appropriate, and the lack of adequate equipment. The application of the Kaizen 5S method aims to improve work efficiency through better material/equipment management and creating an organized work environment. Thus, it is hoped that the application of both methods can reduce delays and prevent similar problems in the future.

Authors

Institutions

Publication Details

Journal
Teknika STTKD Jurnal Teknik Elektronik Engine
Published
2024-12-10
DOI
https://doi.org/10.56521/teknika.v10i2.1294
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALISIS PENYEBAB KETERLAMBATAN PEKERJAAN REPLATING LAMBUNG PADA PROYEK KAPAL X MENGGUNAKAN METODE FAULT TREE ANALYSIS

Agil Triwardani, Sinta Dewi
Teknika STTKD Jurnal Teknik Elektronik Engine
Management and Optimization Techniques
article

ANALISIS PENYEBAB KETERLAMBATAN PEKERJAAN REPLATING LAMBUNG PADA PROYEK KAPAL X MENGGUNAKAN METODE FAULT TREE ANALYSIS

Agil Triwardani, Sinta Dewi
article en

Abstract

The The success of a project is marked by the achievement of the planned target. However, in its implementation, delays often occur, including in the hull replating work. In the ship repair project X at PT XYZ, this work experienced a schedule delay due to constraints on materials/equipment, labor, and management. The purpose of this study was to determine the root cause of the delay and propose improvements. The analysis was carried out using the Fault Tree Analysis (FTA) method to identify the root cause of the delay, while the improvement proposal was carried out using the Kaizen 5S method (Seiri, Seiton, Seiso, Seiketsu, Shitsuke). Based on the results of the analysis using the FTA method, the main factor causing the delay was the material/equipment factor with a probability value of 0.304. This factor includes three main indicators of the cause of the delay, namely the delay in the arrival of materials, the ordered materials are not appropriate, and the lack of adequate equipment. The application of the Kaizen 5S method aims to improve work efficiency through better material/equipment management and creating an organized work environment. Thus, it is hoped that the application of both methods can reduce delays and prevent similar problems in the future.

Teknika STTKD Jurnal Teknik Elektronik EngineVol. 10(2)
University of Pembangunan Nasional Veteran Jawa Timur (ID)
Openalex Percentile: Top 57%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.