OPTIMALISASI PENJADWALAN PERBAIKAN KAPAL DI PT X PADA PROYEK Y DENGAN CRITICAL PATH METHOD

In the shipyard industry, the results of work often differ from the initial plans, including in the scheduling of ship repairs. Therefore, a method is needed to optimize the planning of shipyard projects. One approach used is network planning or network diagrams, which serve to determine the critical path (CP) of the tasks being performed. This method facilitates work network planning and identifies tasks that are part of the critical path. This study aims to identify the critical path of the broken-down tasks and to calculate labor acceleration, resource allocation, and the required costs. This method is applied to optimize the ship repair schedule at PT X for Project Y using the Critical Path Method (CPM) supported by Microsoft Project. In the bottop hull area, the initial work duration of 7 days was reduced to 5 days after crashing. The productivity calculation focuses on the bottop hull area, as this task has a clear and fixed unit of measurement, namely m². The research results show that the productivity index before crashing was 18 m²/person per day, with a productivity cost of Rp. 4,166.67/m²/person. After adding 2 workers, the distribution of labor became more even, although the productivity per person decreased to 15.12 m²/person per day. The productivity cost also increased to Rp. 4,960.31/m²/person.

Authors

Institutions

Publication Details

Journal
Teknika STTKD Jurnal Teknik Elektronik Engine
Published
2024-12-10
DOI
https://doi.org/10.56521/teknika.v10i2.1287
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

OPTIMALISASI PENJADWALAN PERBAIKAN KAPAL DI PT X PADA PROYEK Y DENGAN CRITICAL PATH METHOD

M. Husin As ari Husin, Akmal Suryadi
Teknika STTKD Jurnal Teknik Elektronik Engine
Management and Optimization Techniques
article

OPTIMALISASI PENJADWALAN PERBAIKAN KAPAL DI PT X PADA PROYEK Y DENGAN CRITICAL PATH METHOD

M. Husin As ari Husin, Akmal Suryadi
article en

Abstract

In the shipyard industry, the results of work often differ from the initial plans, including in the scheduling of ship repairs. Therefore, a method is needed to optimize the planning of shipyard projects. One approach used is network planning or network diagrams, which serve to determine the critical path (CP) of the tasks being performed. This method facilitates work network planning and identifies tasks that are part of the critical path. This study aims to identify the critical path of the broken-down tasks and to calculate labor acceleration, resource allocation, and the required costs. This method is applied to optimize the ship repair schedule at PT X for Project Y using the Critical Path Method (CPM) supported by Microsoft Project. In the bottop hull area, the initial work duration of 7 days was reduced to 5 days after crashing. The productivity calculation focuses on the bottop hull area, as this task has a clear and fixed unit of measurement, namely m². The research results show that the productivity index before crashing was 18 m²/person per day, with a productivity cost of Rp. 4,166.67/m²/person. After adding 2 workers, the distribution of labor became more even, although the productivity per person decreased to 15.12 m²/person per day. The productivity cost also increased to Rp. 4,960.31/m²/person.

Teknika STTKD Jurnal Teknik Elektronik EngineVol. 10(2)
University of Pembangunan Nasional Veteran Jawa Timur (ID)
Openalex Percentile: Top 57%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

OPTIMALISASI PENJADWALAN PERBAIKAN KAPAL DI PT X PADA PROYEK Y DENGAN CRITICAL PATH METHOD — M. Husin As ari Husin, Akmal Suryadi · Teknika STTKD Jurnal Teknik Elektronik Engine (2024) | TGRS Research Map | TGRS