Safety Assessment of the Cover-and-Cut Method Under Blasting Vibration Induced by Tunnel Excavation

In evaluating the construction safety of the building in the subway tunnel using the cover-and-cut method, the main objective is to analyze the diaphragm wall, the central pillar, and the roof. This article conducted a blasting vibration test based on the background of the Guiyang Metro Line 3 project and used the FLAC3D software to establish a three-dimensional numerical model. The results showed that the peak particle velocity (PPV) decreased with increasing distance from the blasting center. The PPV measured at the underground diaphragm wall was 1.424 cm/s, while at the bottom of the central pillar it was 1.482 cm/s. The predicted PPV on the roof was up to 1.537 cm/s, which met the safety standards. According to the cloud map of particle vibration velocity and the comprehensive analysis of particle vibration velocity, the degree of impact of artificial structures in the subway tunnel was the central pillar, the underground diaphragm wall, and the roof in order from high to low. After eight blasting operations per day, the vibration velocity trend at the vulnerable point of the central column increases, but it will not exceed the safety standard.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2024-12-30
DOI
https://doi.org/10.3390/app15010260
Citations
1
Primary Topic
Underground infrastructure and sustainability
Type
article
Field-Weighted Citation Impact
0.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Safety Assessment of the Cover-and-Cut Method Under Blasting Vibration Induced by Tunnel Excavation

Chi En-an, Yunhao Che
1 citations
Applied Sciences
Underground infrastructure and sustainability
0.27
article

Safety Assessment of the Cover-and-Cut Method Under Blasting Vibration Induced by Tunnel Excavation

Chi En-an, Yunhao Che
article en
1 citations

Abstract

In evaluating the construction safety of the building in the subway tunnel using the cover-and-cut method, the main objective is to analyze the diaphragm wall, the central pillar, and the roof. This article conducted a blasting vibration test based on the background of the Guiyang Metro Line 3 project and used the FLAC3D software to establish a three-dimensional numerical model. The results showed that the peak particle velocity (PPV) decreased with increasing distance from the blasting center. The PPV measured at the underground diaphragm wall was 1.424 cm/s, while at the bottom of the central pillar it was 1.482 cm/s. The predicted PPV on the roof was up to 1.537 cm/s, which met the safety standards. According to the cloud map of particle vibration velocity and the comprehensive analysis of particle vibration velocity, the degree of impact of artificial structures in the subway tunnel was the central pillar, the underground diaphragm wall, and the roof in order from high to low. After eight blasting operations per day, the vibration velocity trend at the vulnerable point of the central column increases, but it will not exceed the safety standard.

Applied SciencesVol. 15(1)
Guizhou University (CN), Guizhou Minzu University (CN)
Sustainable cities and communities
Openalex Percentile: Top 40%
Underground infrastructure and sustainability
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.