Optimizing Construction Project Plan Management Using Parameter-Adaptive Improved Genetic Algorithm

This study proposes an optimization method for construction project plan management using a parameter-adaptive improved genetic algorithm (IGA) combined with differential evolution (DE). The method addresses the challenges of inflexibility, inefficient resource allocation, and unscientific scheduling in traditional project management approaches. A multi-objective optimization model that balances project duration and resource utilization is developed. A case study demonstrated that the optimized methods reduced the project duration by up to 22.7% and the resource variance by up to 29.9% compared to the original plan. The proposed method enhances the flexibility and efficiency of construction project planning, contributing to both theoretical advancement in optimization algorithms and practical improvements in project management.

Institutions

Publication Details

Journal
Tehnicki vjesnik - Technical Gazette
Published
2024-12-31
DOI
https://doi.org/10.17559/tv-20240720001868
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing Construction Project Plan Management Using Parameter-Adaptive Improved Genetic Algorithm

1 citations
Tehnicki vjesnik - Technical Gazette
BIM and Construction Integration
0.27
article

Optimizing Construction Project Plan Management Using Parameter-Adaptive Improved Genetic Algorithm

article en
1 citations

Abstract

This study proposes an optimization method for construction project plan management using a parameter-adaptive improved genetic algorithm (IGA) combined with differential evolution (DE). The method addresses the challenges of inflexibility, inefficient resource allocation, and unscientific scheduling in traditional project management approaches. A multi-objective optimization model that balances project duration and resource utilization is developed. A case study demonstrated that the optimized methods reduced the project duration by up to 22.7% and the resource variance by up to 29.9% compared to the original plan. The proposed method enhances the flexibility and efficiency of construction project planning, contributing to both theoretical advancement in optimization algorithms and practical improvements in project management.

Tehnicki vjesnik - Technical GazetteVol. 32(1)
Huzhou Vocational and Technical College (CN)
Openalex Percentile: Top 40%
BIM and Construction Integration
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.