Techno-economic assessment of Bilacenge PV grid system in Southwest Sumba

A solar photovoltaic (PV) grid system with an Energy Management System (EMS) has been installed in Bilacenge, Southwest Sumba. This 400 kWp PV-Grid system is the first system in Indonesia that can control the electricity output to the grid. It comprises two battery blocks that support the system to maximize electricity generation. This study has been conducted to evaluate the installed PV-grid system with EMS compared to diesel generators commonly used in remote areas. The study employs various techno-economic methods, including life cycle cost (LCC), levelized cost of energy (LCoE), and economic feasibility analysis based on several parameters such as net present value (NPV), payback period (PBP), and benefit-cost ratio (BCR). The results show that the system will experience a return on investment after operating for 34 years, accompanied by a benefit-cost ratio value of 0.60, which indicates that the investment of this PV grid system is not economically profitable.

Authors

Institutions

Publication Details

Journal
Mechatronics Electrical Power and Vehicular Technology
Published
2024-12-31
DOI
https://doi.org/10.55981/j.mev.2024.991
Primary Topic
Smart Grid Energy Management
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Techno-economic assessment of Bilacenge PV grid system in Southwest Sumba

Eka Nurdiana, Dannya Maharani Putri Utami, Arya Rezavidi, Dwie Vannia Dianti et al.
Mechatronics Electrical Power and Vehicular Technology
Smart Grid Energy Management
article

Techno-economic assessment of Bilacenge PV grid system in Southwest Sumba

Eka Nurdiana, Dannya Maharani Putri Utami, Arya Rezavidi, Dwie Vannia Dianti, Zakariya Arif Fikriyadi, Muhammad Very Nugroho, Kholid Akhmad, Fajril Mardiansah, Yusuf Margowadi
article en

Abstract

A solar photovoltaic (PV) grid system with an Energy Management System (EMS) has been installed in Bilacenge, Southwest Sumba. This 400 kWp PV-Grid system is the first system in Indonesia that can control the electricity output to the grid. It comprises two battery blocks that support the system to maximize electricity generation. This study has been conducted to evaluate the installed PV-grid system with EMS compared to diesel generators commonly used in remote areas. The study employs various techno-economic methods, including life cycle cost (LCC), levelized cost of energy (LCoE), and economic feasibility analysis based on several parameters such as net present value (NPV), payback period (PBP), and benefit-cost ratio (BCR). The results show that the system will experience a return on investment after operating for 34 years, accompanied by a benefit-cost ratio value of 0.60, which indicates that the investment of this PV grid system is not economically profitable.

Mechatronics Electrical Power and Vehicular TechnologyVol. 15(2)
Nuclear Energy Agency (FR), National Research and Innovation Agency (ID), Delft University of Technology (NL)
Badan Riset dan Inovasi Nasional
Responsible consumption and production
Openalex Percentile: Top 77%
Smart Grid Energy Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.