Research On Optimal Allocation Of Energy Storage In Large-scale New Energy Transmission Bases
For the large-scale new energy transmission system containing wind, fire and thermal storage, the optimal allocation of lithium battery energy storage capacity is of great significance to improve the system's new energy utilisation rate and operation economy. In this paper, we propose an optimal allocation method of energy storage capacity based on a time series production simulation of 8760 hours in a year, aiming at minimising the required planned energy storage capacity, taking into account the confidence probability of outgoing transmission, the proportion of grid-sink power and the operational constraints of the energy storage system, and inputting the theoretical output sequence of wind and fire storage for the whole year, so as to achieve the optimal allocation of storage capacity in terms of economy, safety and cleanliness through the model solving. The effectiveness of the time-sequence production simulation method is verified, and the specific impacts of factors such as grid-sink power volume ratio and outgoing confidence probability on the allocation results are quantified.
Authors
- Weiwei Yang (ORCID: https://orcid.org/0000-0003-3062-6023)
- Ziyi Zhang (ORCID: https://orcid.org/0000-0001-7563-5236)
- Bo Wang (ORCID: https://orcid.org/0000-0002-2918-1912)
- Peng Li (ORCID: https://orcid.org/0000-0002-9026-9999)
- Shujun Liu (ORCID: https://orcid.org/0000-0002-6608-2286)
Institutions
- China Three Gorges Corporation (China) (CN)
Publication Details
- Published
- 2024-10-25
- DOI
- https://doi.org/10.1109/acfpe63443.2024.10801035
- Citations
- 1
- Primary Topic
- Power Systems and Renewable Energy
- Type
- article
- Field-Weighted Citation Impact
- 0.17
Funders
- China Three Gorges Corporation