Early Warning Method for Overload of Massive Transformer Based on TL-LSTM Model

To address the issues of low prediction accuracy and limited capability in handling large datasets in power load forecasting methods, this paper proposes a novel load forecasting model based on transfer learning (TL) and long short-term memory (LSTM) neural networks. Firstly, using the maximum mutual information coefficient method (MIC) to select high relevance load features; Secondly, a load prediction model is constructed by employing transfer learning and long short-term memory networks to effectively predict the loads of a large number of substations; Finally, using the predicted load rate and the heavy overload assessment criteria, the final heavy overload warning results for distribution substations are determined. Compared with the traditional method, this method can greatly improve the model's ability to handle big data and retain the timeliness of load forecasting while maintaining a certain level of forecasting accuracy.

Authors

Institutions

Publication Details

Published
2024-10-25
DOI
https://doi.org/10.1109/icsgsc62639.2024.10813968
Primary Topic
Machine Fault Diagnosis Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Early Warning Method for Overload of Massive Transformer Based on TL-LSTM Model

Gaiping Sun, Ziqi Ye, Fan Yang, Jun Liu et al.
Machine Fault Diagnosis Techniques
article

Early Warning Method for Overload of Massive Transformer Based on TL-LSTM Model

Gaiping Sun, Ziqi Ye, Fan Yang, Jun Liu, Bingbing Lu
article en

Abstract

To address the issues of low prediction accuracy and limited capability in handling large datasets in power load forecasting methods, this paper proposes a novel load forecasting model based on transfer learning (TL) and long short-term memory (LSTM) neural networks. Firstly, using the maximum mutual information coefficient method (MIC) to select high relevance load features; Secondly, a load prediction model is constructed by employing transfer learning and long short-term memory networks to effectively predict the loads of a large number of substations; Finally, using the predicted load rate and the heavy overload assessment criteria, the final heavy overload warning results for distribution substations are determined. Compared with the traditional method, this method can greatly improve the model's ability to handle big data and retain the timeliness of load forecasting while maintaining a certain level of forecasting accuracy.

Shanghai University of Electric Power (CN)
Affordable and clean energy
Openalex Percentile: Top 70%
Machine Fault Diagnosis Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Early Warning Method for Overload of Massive Transformer Based on TL-LSTM Model — Gaiping Sun, Ziqi Ye, et al. · (2024) | TGRS Research Map | TGRS