Using the Fuzzy Analytic Hierarchy Process (FAHP) for Evaluating the Factors Affecting Building Rehabilitation Cost Management in Iraq

This research aims to evaluate the factors affecting building rehabilitation cost management using the fuzzy analytical hierarchy process (FAHP) model. A literature review, case studies, consultations with experts, and questionnaires were used to identify and categorize fifty-seven factors into six categories. The proposed model has considered twenty factors out of the fifty-seven. The main factor with the highest weight in building rehabilitation cost management in Iraq is the building characteristics, with a weight of 0.298. Design and bill of quantities issues follow this with a weight of 0.204. The next factor is project management Issues with a weight of 0.185. Planning and contract management factors come next with a weight of 0.150. Safety and environmental factors have a weight of 0.104. The element with the lowest weight is economic and financial factors, with a weight of 0.058. This order of elements highlights their importance in affecting cost management. The prioritization within each category is outlined with due consideration to the weights assigned to the main factors. The significance of required quality standards and site visit to the building under the design and bill of quantities, while planning and contract management prioritize project duration and general and specific contract conditions. Building characteristics prioritize the number of floors in the building and its location, economic and financial factors emphasize fluctuations in currency exchange rates and labor costs, and safety and environmental concerns are anchored by health, safety, awareness and training. Project management emphasizes change orders and a lack of coordination among team.

Authors

Institutions

Publication Details

Journal
Journal of Engineering
Published
2024-12-31
DOI
https://doi.org/10.31026/j.eng.2025.01.02
Primary Topic
Multi-Criteria Decision Making
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Using the Fuzzy Analytic Hierarchy Process (FAHP) for Evaluating the Factors Affecting Building Rehabilitation Cost Management in Iraq

Hatem Khaleefah Breesam, Ayad Abbas Obaid Al-Shiblawi
1 links
Journal of Engineering
Multi-Criteria Decision Making
article

Using the Fuzzy Analytic Hierarchy Process (FAHP) for Evaluating the Factors Affecting Building Rehabilitation Cost Management in Iraq

Hatem Khaleefah Breesam, Ayad Abbas Obaid Al-Shiblawi
article en

Abstract

This research aims to evaluate the factors affecting building rehabilitation cost management using the fuzzy analytical hierarchy process (FAHP) model. A literature review, case studies, consultations with experts, and questionnaires were used to identify and categorize fifty-seven factors into six categories. The proposed model has considered twenty factors out of the fifty-seven. The main factor with the highest weight in building rehabilitation cost management in Iraq is the building characteristics, with a weight of 0.298. Design and bill of quantities issues follow this with a weight of 0.204. The next factor is project management Issues with a weight of 0.185. Planning and contract management factors come next with a weight of 0.150. Safety and environmental factors have a weight of 0.104. The element with the lowest weight is economic and financial factors, with a weight of 0.058. This order of elements highlights their importance in affecting cost management. The prioritization within each category is outlined with due consideration to the weights assigned to the main factors. The significance of required quality standards and site visit to the building under the design and bill of quantities, while planning and contract management prioritize project duration and general and specific contract conditions. Building characteristics prioritize the number of floors in the building and its location, economic and financial factors emphasize fluctuations in currency exchange rates and labor costs, and safety and environmental concerns are anchored by health, safety, awareness and training. Project management emphasizes change orders and a lack of coordination among team.

Journal of EngineeringVol. 31(1)
University of Baghdad (IQ)
University of Baghdad
Decent work and economic growth
Openalex Percentile: Top 69%
Multi-Criteria Decision Making
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Using the Fuzzy Analytic Hierarchy Process (FAHP) for Evaluating the Factors Affecting Building Rehabilitation Cost Management in Iraq — Hatem Khaleefah Breesam, Ayad Abbas Obaid Al-Shiblawi · Journal of Engineering (2024) | TGRS Research Map | TGRS