A Study on the Causes of Sedimentation at the Quay Wall in Busan New Port

Since the construction of the Busan New Port, dredging has been performed to deepen the navigation channel due to the continuous enlargement of vessels. However, since the recent confirmation of the phenomenon of sedimentation across the entire quay wall, it was initially assumed that the cause was simply the influence of suspended sediment flowing in from the Nakdong River Estuary. Therefore, a marine physical survey and numerical simulation of seawater flow and sediment movement were conducted centered on the Pier bridge to the Nakdong River Estuary, and a bathymetric survey was conducted within the Busan New Port and between the Pier bridge and Nullcha-do. As a result of the bathymetric survey, the net sedimentation within the port in a certain area of the port in 2017 and 2022 was 2,054 m<sup>3</sup>, and the amount of erosion in the fairway was no different from the amount of sedimentation in mooring basin. However, in the numerical simulation of sediment movement, erosion occurred in all areas except the Pier bridge, and the annual deposition was up to 5 times less than the actually measured topographic change, so it was determined that it is not a direct cause of the sedimentation across the entire quay wall of the New Port. In particular, the area that is eroded 1.5 m more than the planned depth of D.L.(-)17 m in the central part of the new port is widely distributed and the phenomenon of deposition on the quay wall shows that the initial assumption is not correct. Therefore, the scour for large vessels, the last factor that can affect the seabed of the new port, was additionally examined, and the seabed scour equation by the ship's wake speed was applied. As a result, it was confirmed that the maximum scour depth by the ship's wake speed is 1.5 m in the case of the largest vessel that can enter the port, 240,000 tons, and the scoured floating sand can move in the normal direction of the route.

Authors

Institutions

Publication Details

Journal
Journal of Korean Society of Coastal and Ocean Engineers
Published
2024-12-31
DOI
https://doi.org/10.9765/kscoe.2024.36.6.233
Primary Topic
3D Modeling in Geospatial Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Study on the Causes of Sedimentation at the Quay Wall in Busan New Port

Han-Sam Yoon, H Lee, Chanho Yoo, Hyungjun Lim et al.
Journal of Korean Society of Coastal and Ocean Engineers
3D Modeling in Geospatial Applications
article

A Study on the Causes of Sedimentation at the Quay Wall in Busan New Port

Han-Sam Yoon, H Lee, Chanho Yoo, Hyungjun Lim, Jong Won Kim
article en

Abstract

Since the construction of the Busan New Port, dredging has been performed to deepen the navigation channel due to the continuous enlargement of vessels. However, since the recent confirmation of the phenomenon of sedimentation across the entire quay wall, it was initially assumed that the cause was simply the influence of suspended sediment flowing in from the Nakdong River Estuary. Therefore, a marine physical survey and numerical simulation of seawater flow and sediment movement were conducted centered on the Pier bridge to the Nakdong River Estuary, and a bathymetric survey was conducted within the Busan New Port and between the Pier bridge and Nullcha-do. As a result of the bathymetric survey, the net sedimentation within the port in a certain area of the port in 2017 and 2022 was 2,054 m<sup>3</sup>, and the amount of erosion in the fairway was no different from the amount of sedimentation in mooring basin. However, in the numerical simulation of sediment movement, erosion occurred in all areas except the Pier bridge, and the annual deposition was up to 5 times less than the actually measured topographic change, so it was determined that it is not a direct cause of the sedimentation across the entire quay wall of the New Port. In particular, the area that is eroded 1.5 m more than the planned depth of D.L.(-)17 m in the central part of the new port is widely distributed and the phenomenon of deposition on the quay wall shows that the initial assumption is not correct. Therefore, the scour for large vessels, the last factor that can affect the seabed of the new port, was additionally examined, and the seabed scour equation by the ship's wake speed was applied. As a result, it was confirmed that the maximum scour depth by the ship's wake speed is 1.5 m in the case of the largest vessel that can enter the port, 240,000 tons, and the scoured floating sand can move in the normal direction of the route.

Journal of Korean Society of Coastal and Ocean EngineersVol. 36(6)
DM3D Technology (United States) (US), Pukyong National University (KR)
Life below water
Openalex Percentile: Top 73%
3D Modeling in Geospatial Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.