Perencanaan Ulang Jembatan Kalibanger Integrasi BIM 4D

Technological developments in the construction world are also growing along with technology development. The application of BIM (Building Information Modeling) is one of the technological developments that can simplify the construction process, optimize time and human resources, and collaboration between stakeholders. Kalibanger Bridge is one of the bridges that crosses the Kalibanger River, connecting Semarang City and Demak Regency. The Kalibanger Bridge Replacement Project has been carried out from September 2022 to October 2023. Based on BIM, the re-planning of Kalibanger Bridge, Semarang City, was done by re-planning, modeling, and project scheduling. The methods presented are data collection, data analysis and structural analysis, 3D modeling using Tekla Structures, preparation of RAB, and scheduling. The re-planning of Kalibanger Bridge with BIM integration is expected to increase the ease and accuracy of the quantity take-off process and facilitate the scheduling process.

Authors

Institutions

Publication Details

Journal
Jurnal Sipil dan Arsitektur
Published
2024-12-30
DOI
https://doi.org/10.14710/pilars.2.4.2024.16-25
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Perencanaan Ulang Jembatan Kalibanger Integrasi BIM 4D

Asri Nurdiana, Bambang Setiabudi, Syifa Pradita
Jurnal Sipil dan Arsitektur
Occupational Health and Safety Management
article

Perencanaan Ulang Jembatan Kalibanger Integrasi BIM 4D

Asri Nurdiana, Bambang Setiabudi, Syifa Pradita
article en

Abstract

Technological developments in the construction world are also growing along with technology development. The application of BIM (Building Information Modeling) is one of the technological developments that can simplify the construction process, optimize time and human resources, and collaboration between stakeholders. Kalibanger Bridge is one of the bridges that crosses the Kalibanger River, connecting Semarang City and Demak Regency. The Kalibanger Bridge Replacement Project has been carried out from September 2022 to October 2023. Based on BIM, the re-planning of Kalibanger Bridge, Semarang City, was done by re-planning, modeling, and project scheduling. The methods presented are data collection, data analysis and structural analysis, 3D modeling using Tekla Structures, preparation of RAB, and scheduling. The re-planning of Kalibanger Bridge with BIM integration is expected to increase the ease and accuracy of the quantity take-off process and facilitate the scheduling process.

Jurnal Sipil dan ArsitekturVol. 2(4)
Diponegoro University (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 56%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Perencanaan Ulang Jembatan Kalibanger Integrasi BIM 4D — Asri Nurdiana, Bambang Setiabudi, et al. · Jurnal Sipil dan Arsitektur (2024) | TGRS Research Map | TGRS