BULANGO ULU RESERVOIR OPERATIONAL PATTERN MODEL

The Bulango Ulu Reservoir is located in Gorontalo Province, the construction of the Bulango Ulu Reservoir is to meet the needs of raw water, irrigation water, and hydropower, to ensure whether the need and availability of water in the rainy and dry seasons can meet the initial planning goals. In this study, the method used is to simulate the operation pattern of the reservoir with variations in the wet season with the probability of discharge (66.67%), the normal season with the probability of discharge (50%), and the dry season with the probability of discharge (33.33%) so as to determine the availability of the Bulango Ulu Reservoir during the rainy season and dry season whether the needs can be met. The results obtained can be used as input for the regulation of the Bulango Ulu Reservoir operation pattern.

Authors

Institutions

Publication Details

Journal
INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD)
Published
2024-12-29
DOI
https://doi.org/10.25105/cesd.v7i2.21525
Primary Topic
Engineering and Technology Innovations
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

BULANGO ULU RESERVOIR OPERATIONAL PATTERN MODEL

Barry Yusuf Labdul, Rawiyah Husnan, Elma Tiani Nani
INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD)
Engineering and Technology Innovations
article

BULANGO ULU RESERVOIR OPERATIONAL PATTERN MODEL

Barry Yusuf Labdul, Rawiyah Husnan, Elma Tiani Nani
article en

Abstract

The Bulango Ulu Reservoir is located in Gorontalo Province, the construction of the Bulango Ulu Reservoir is to meet the needs of raw water, irrigation water, and hydropower, to ensure whether the need and availability of water in the rainy and dry seasons can meet the initial planning goals. In this study, the method used is to simulate the operation pattern of the reservoir with variations in the wet season with the probability of discharge (66.67%), the normal season with the probability of discharge (50%), and the dry season with the probability of discharge (33.33%) so as to determine the availability of the Bulango Ulu Reservoir during the rainy season and dry season whether the needs can be met. The results obtained can be used as input for the regulation of the Bulango Ulu Reservoir operation pattern.

INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD)Vol. 7(2)
State University of Gorontalo (ID)
Clean water and sanitation
Openalex Percentile: Top 78%
Engineering and Technology Innovations
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.