СИСТЕМА РАЗРАБОТКИ ОБЪЕДИНЕННОГО МЕСТОРОЖДЕНИЯ «ЁШЛИК I И КАЛЬМАКЫР»

Successful experience of exploitation of stockwork copper-molybdenum deposits, in particular the Kalmakyr site, has shown that application of the transport system of development with movement of waste rock to external dumps for specific mining and geological conditions of the combined deposit "Yoshlik I and Kalmakyr" is the only acceptable solution. Development of the deposit "Yoshlik I and Kalmakyr" is envisaged by the open pit method. In accordance with the mining and technical conditions of the deposit, the adopted development system is deepening (prof. V.V. Rzhevsky) with variable position of the working area and transportation of overburden rock by combined transport to external dumps. Ore is transported in two directions: - from the Kalmakyr site - in option No. 1 by rail, in option No. 2 by conveyor transport to the processing plant (MOF-1), located northwest of the combined deposit; – from the Yoshlik I site – from the DPU CPT ore West by conveyor transport to MOF-3, located southwest of the combined deposit.

Authors

Institutions

Publication Details

Journal
Sanoatda raqamli texnologiyalar.
Published
2024-12-27
DOI
https://doi.org/10.70769/3030-3214.srt.2.4-1.2024.31
Citations
1
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.33
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

СИСТЕМА РАЗРАБОТКИ ОБЪЕДИНЕННОГО МЕСТОРОЖДЕНИЯ «ЁШЛИК I И КАЛЬМАКЫР»

Адхам Аманқулович Хасанов
1 citations
Sanoatda raqamli texnologiyalar.
Mining Techniques and Economics
0.33
article

СИСТЕМА РАЗРАБОТКИ ОБЪЕДИНЕННОГО МЕСТОРОЖДЕНИЯ «ЁШЛИК I И КАЛЬМАКЫР»

Адхам Аманқулович Хасанов
article en
1 citations

Abstract

Successful experience of exploitation of stockwork copper-molybdenum deposits, in particular the Kalmakyr site, has shown that application of the transport system of development with movement of waste rock to external dumps for specific mining and geological conditions of the combined deposit "Yoshlik I and Kalmakyr" is the only acceptable solution. Development of the deposit "Yoshlik I and Kalmakyr" is envisaged by the open pit method. In accordance with the mining and technical conditions of the deposit, the adopted development system is deepening (prof. V.V. Rzhevsky) with variable position of the working area and transportation of overburden rock by combined transport to external dumps. Ore is transported in two directions: - from the Kalmakyr site - in option No. 1 by rail, in option No. 2 by conveyor transport to the processing plant (MOF-1), located northwest of the combined deposit; – from the Yoshlik I site – from the DPU CPT ore West by conveyor transport to MOF-3, located southwest of the combined deposit.

Sanoatda raqamli texnologiyalar.Vol. 2(4-1)
Human Growth Foundation (US)
Openalex Percentile: Top 37%
Mining Techniques and Economics
0.33
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.