Applying Robust Fuzzy-stochastic Programming Model in Multi-objective Optimization for Flow-shop Scheduling with Parallel Machines: a Real-life Case Study in an Engine Component Industrial

Resources scheduling, jobs sequencing, and resources assignment are considered the brain activities that play an extremely important role to the business, such as flow-shop scheduling. Additionally, the internal manufacturing environment and the current market are drastically changing, in which attracted significant attention in scheduling under uncertainties. This research aims to investigate the multi-objective flow-shop scheduling with parallel machines under machine breakdown and operational uncertainty. A novel robust fuzzy stochastic programming (RFSP) model is presented to address the unexpected operational disruptions and the inherent uncertainty of processing time. The objective is to optimize the cost of late delivery and the efficiency of manufacturing evaluated by overall equipment effectiveness (OEE) whilst considering the CO2 emissions produced. Eventually, a proposed algorithm is applied with a real-life scheduling data from a German factory that faces a practical situations in machine breakdowns and operational risks with unrelated parallel machines. Thus, this study intends to provide the computational results and useful information for multiple decision processes.

Authors

Institutions

Publication Details

Journal
Engineering Science Letter
Published
2024-09-30
DOI
https://doi.org/10.56741/esl.v3i03.593
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Applying Robust Fuzzy-stochastic Programming Model in Multi-objective Optimization for Flow-shop Scheduling with Parallel Machines: a Real-life Case Study in an Engine Component Industrial

Mai-Ha Phan, Gia Minh Dao
Engineering Science Letter
Scheduling and Optimization Algorithms
article

Applying Robust Fuzzy-stochastic Programming Model in Multi-objective Optimization for Flow-shop Scheduling with Parallel Machines: a Real-life Case Study in an Engine Component Industrial

Mai-Ha Phan, Gia Minh Dao
article en

Abstract

Resources scheduling, jobs sequencing, and resources assignment are considered the brain activities that play an extremely important role to the business, such as flow-shop scheduling. Additionally, the internal manufacturing environment and the current market are drastically changing, in which attracted significant attention in scheduling under uncertainties. This research aims to investigate the multi-objective flow-shop scheduling with parallel machines under machine breakdown and operational uncertainty. A novel robust fuzzy stochastic programming (RFSP) model is presented to address the unexpected operational disruptions and the inherent uncertainty of processing time. The objective is to optimize the cost of late delivery and the efficiency of manufacturing evaluated by overall equipment effectiveness (OEE) whilst considering the CO2 emissions produced. Eventually, a proposed algorithm is applied with a real-life scheduling data from a German factory that faces a practical situations in machine breakdowns and operational risks with unrelated parallel machines. Thus, this study intends to provide the computational results and useful information for multiple decision processes.

Engineering Science LetterVol. 3(03)
Vietnam National University Ho Chi Minh City (VN)
Ho Chi Minh City University of Technology and Education, Viet Nam National University Ho Chi Minh City
Openalex Percentile: Top 64%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Applying Robust Fuzzy-stochastic Programming Model in Multi-objective Optimization for Flow-shop Scheduling with Parallel Machines: a Real-life Case Study in an Engine Component Industrial — Mai-Ha Phan, Gia Minh Dao · Engineering Science Letter (2024) | TGRS Research Map | TGRS