Deficiencies causes in road construction scheduling: Perspectives from construction professionals

Effective construction scheduling is crucial for the success of road projects. However, deficiencies in this scheduling can lead to significant challenges such as delays, cost overruns, and litigation. Therefore, project managers need to understand the causes that contribute to these deficiencies thoroughly. Unfortunately, there has been little research examining these elements in detail. To address this gap, this study examined the causes that affect the scheduling of construction processes for road projects. The research method involved four stages: (1) identification of causes affecting construction scheduling, (2) design and application of a questionnaire, (3) influence analysis, and (4) exploratory quantitative analysis. The study identified 34 causes of deficiencies in the scheduling of road construction processes in six categories: workforce, machinery, material, measurement, environment, and method. Thirty-two experts were consulted to evaluate the frequency and severity of each cause based on a relative influence index. The causes with the greatest impact on deficiencies in road construction scheduling were poor estimation of labor performance, poor estimation of workforce quantity, and deficient coordination with public utilities. The findings allow managers to pinpoint the root causes of road construction planning problems and identify effective solutions.

Authors

Institutions

Publication Details

Journal
Heliyon
Published
2024-12-26
DOI
https://doi.org/10.1016/j.heliyon.2024.e41514
Citations
16
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
4.24

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Deficiencies causes in road construction scheduling: Perspectives from construction professionals

Guillermo Mejía, Omar Sánchez, Karen Castañeda, Rodrigo F. Herrera
16 citations
Heliyon
BIM and Construction Integration
4.24
article

Deficiencies causes in road construction scheduling: Perspectives from construction professionals

Guillermo Mejía, Omar Sánchez, Karen Castañeda, Rodrigo F. Herrera
article en
16 citations

Abstract

Effective construction scheduling is crucial for the success of road projects. However, deficiencies in this scheduling can lead to significant challenges such as delays, cost overruns, and litigation. Therefore, project managers need to understand the causes that contribute to these deficiencies thoroughly. Unfortunately, there has been little research examining these elements in detail. To address this gap, this study examined the causes that affect the scheduling of construction processes for road projects. The research method involved four stages: (1) identification of causes affecting construction scheduling, (2) design and application of a questionnaire, (3) influence analysis, and (4) exploratory quantitative analysis. The study identified 34 causes of deficiencies in the scheduling of road construction processes in six categories: workforce, machinery, material, measurement, environment, and method. Thirty-two experts were consulted to evaluate the frequency and severity of each cause based on a relative influence index. The causes with the greatest impact on deficiencies in road construction scheduling were poor estimation of labor performance, poor estimation of workforce quantity, and deficient coordination with public utilities. The findings allow managers to pinpoint the root causes of road construction planning problems and identify effective solutions.

HeliyonVol. 11(2)
Universidad Industrial de Santander (CO), Pontificia Universidad Católica de Valparaíso (CL), Pontificia Universidad Javeriana (CO)
Departamento Administrativo de Ciencia, Tecnología e Innovación (COLCIENCIAS), Pontificia Universidad Católica de Valparaíso, Pontificia Universidad Javeriana, Agencia Nacional de Investigación y Desarrollo
Sustainable cities and communities
Openalex Percentile: Top 5%
BIM and Construction Integration
4.24
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.