Design, Implementation and Environmental Impact of Cutoff Wall for Pollution Control in an Industrial Legacy Site

Heavy metal-organic pollutants compound pollution at industrial legacy sites and have caused damage to the ecological environment and human health during recent decades. In view of the difficulty and high cost of post-contamination remediation, it is worth studying, and practically applying, cutoff walls to reduce the spread of pollution in advance. In this study, field-scale studies were carried out at e-waste dismantling legacy sites in Taizhou, Zhejiang Province of China, through the process of site investigation, numerical simulation, and cutoff wall practical application. Firstly, the concentrations and spatial distributions of Pb, Cd and polychlorinated biphenyls (PCBs) and poly brominated diphenyl ethers (PBDEs) were identified in both soil and groundwater. Then, potential dispersal routes of key combined contaminants (Pb and PCBs) at the soil-groundwater interface were systematically studied through numerical simulation applying Visual MODFLOW-MT3DMS. One site was chosen to predict the barrier effect of differently sized cutoff walls based on the migration path of compound pollutants. A protocol for a cutoff wall (50 m length × 2 m width × 3 m height) was finally verified and applied at the real contaminated site for the blocking of compound pollutant diffusion. Further, the groundwater quality of the contaminated site was monitored consecutively for six months to ensure the durability and stability of barrier measures. All pollutant indicators, including for Pb and PCB complex pollutants, were reduced to below the national Grade IV groundwater standard value, achieving environmental standards at these polluted sites and providing possibilities for land reuse. In summary, this field-scale test provided new ideas for designing cutoff walls to block the diffusion of complex pollutants; it also laid a basis for the practical application of cutoff walls in pollution prevention and control of complex contaminated sites and for soil-groundwater environmental protection at industrial heritage sites.

Authors

Institutions

Publication Details

Journal
Toxics
Published
2024-12-25
DOI
https://doi.org/10.3390/toxics13010011
Citations
1
Primary Topic
Environmental remediation with nanomaterials
Type
article
Field-Weighted Citation Impact
0.18

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design, Implementation and Environmental Impact of Cutoff Wall for Pollution Control in an Industrial Legacy Site

Sichen Chen, Huang Yan, Lu Yu, Zhihong Zhang et al.
1 citations
Toxics
Environmental remediation with nanomaterials
0.18
article

Design, Implementation and Environmental Impact of Cutoff Wall for Pollution Control in an Industrial Legacy Site

Sichen Chen, Huang Yan, Lu Yu, Zhihong Zhang, Wang Jinnan
article en
1 citations

Abstract

Heavy metal-organic pollutants compound pollution at industrial legacy sites and have caused damage to the ecological environment and human health during recent decades. In view of the difficulty and high cost of post-contamination remediation, it is worth studying, and practically applying, cutoff walls to reduce the spread of pollution in advance. In this study, field-scale studies were carried out at e-waste dismantling legacy sites in Taizhou, Zhejiang Province of China, through the process of site investigation, numerical simulation, and cutoff wall practical application. Firstly, the concentrations and spatial distributions of Pb, Cd and polychlorinated biphenyls (PCBs) and poly brominated diphenyl ethers (PBDEs) were identified in both soil and groundwater. Then, potential dispersal routes of key combined contaminants (Pb and PCBs) at the soil-groundwater interface were systematically studied through numerical simulation applying Visual MODFLOW-MT3DMS. One site was chosen to predict the barrier effect of differently sized cutoff walls based on the migration path of compound pollutants. A protocol for a cutoff wall (50 m length × 2 m width × 3 m height) was finally verified and applied at the real contaminated site for the blocking of compound pollutant diffusion. Further, the groundwater quality of the contaminated site was monitored consecutively for six months to ensure the durability and stability of barrier measures. All pollutant indicators, including for Pb and PCB complex pollutants, were reduced to below the national Grade IV groundwater standard value, achieving environmental standards at these polluted sites and providing possibilities for land reuse. In summary, this field-scale test provided new ideas for designing cutoff walls to block the diffusion of complex pollutants; it also laid a basis for the practical application of cutoff walls in pollution prevention and control of complex contaminated sites and for soil-groundwater environmental protection at industrial heritage sites.

ToxicsVol. 13(1)
Beijing University of Technology (CN)
National Natural Science Foundation of China, National Key Research and Development Program of China
Openalex Percentile: Top 49%
Environmental remediation with nanomaterials
0.18
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.