PROBLEMS OF CHEBOKSARY RESERVOIR AT PRESENT STAGE

The history of creation and development of Cheboksary hydroelectric power plant has always been of interest to researchers. The reservoir has been at a low level for many years. This condition results in numerous problems. The relevance of the study lies in the fact that currently the problem of the reservoir affects the interests of the population in three regions. The purpose of the study is to examine the problems of Cheboksary reservoir in the light of the economic development of the regions at present stage. Materials and methods. Various sources were used to work on the topic: archival documents, journalistic literature, articles in scientific journals and periodicals. The study was carried out using the comparative-historical method and the method of system analysis, which made it possible to generalize the data of sources and group heterogeneous judgments and assessments. Study results. In the 2010s, the Program of Comprehensive Survey of the Cheboksary Reservoir Zone was carried out. The survey revealed a number of problems related to the operation of the reservoir and the state of engineering protection. The Cheboksary hydroelectric complex is currently operated at an off-design level, in which the station does not produce electricity necessary for the economic development of the regions. In addition, there is a destruction of engineering protection facilities, territories and settlements are flooded, erosive processes are progressing, and water quality is deteriorating. Power engineers propose to solve this problem by raising the water level in the reservoir to the design level. However, not everyone agrees with this decision. Conclusions. There are various federal programs to improve the ecological condition of the reservoir and reduce its negative impact on the environment. The participation of municipal organizations in the programs has a positive effect.

Authors

Institutions

Publication Details

Journal
Historical Search
Published
2024-12-25
DOI
https://doi.org/10.47026/2712-9454-2024-5-4-59-65
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PROBLEMS OF CHEBOKSARY RESERVOIR AT PRESENT STAGE

Nadezhda Germanovna Rusinova
Historical Search
Oil and Gas Production Techniques
article

PROBLEMS OF CHEBOKSARY RESERVOIR AT PRESENT STAGE

Nadezhda Germanovna Rusinova
article en

Abstract

The history of creation and development of Cheboksary hydroelectric power plant has always been of interest to researchers. The reservoir has been at a low level for many years. This condition results in numerous problems. The relevance of the study lies in the fact that currently the problem of the reservoir affects the interests of the population in three regions. The purpose of the study is to examine the problems of Cheboksary reservoir in the light of the economic development of the regions at present stage. Materials and methods. Various sources were used to work on the topic: archival documents, journalistic literature, articles in scientific journals and periodicals. The study was carried out using the comparative-historical method and the method of system analysis, which made it possible to generalize the data of sources and group heterogeneous judgments and assessments. Study results. In the 2010s, the Program of Comprehensive Survey of the Cheboksary Reservoir Zone was carried out. The survey revealed a number of problems related to the operation of the reservoir and the state of engineering protection. The Cheboksary hydroelectric complex is currently operated at an off-design level, in which the station does not produce electricity necessary for the economic development of the regions. In addition, there is a destruction of engineering protection facilities, territories and settlements are flooded, erosive processes are progressing, and water quality is deteriorating. Power engineers propose to solve this problem by raising the water level in the reservoir to the design level. However, not everyone agrees with this decision. Conclusions. There are various federal programs to improve the ecological condition of the reservoir and reduce its negative impact on the environment. The participation of municipal organizations in the programs has a positive effect.

Historical SearchVol. 5(4)
Chuvash State University (RU)
Clean water and sanitation
Openalex Percentile: Top 68%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

PROBLEMS OF CHEBOKSARY RESERVOIR AT PRESENT STAGE — Nadezhda Germanovna Rusinova · Historical Search (2024) | TGRS Research Map | TGRS