Hazard Identification when Implementing a Construction Facility of Oil-Refining Plant by Contractors

The goal of the study is to develop risk management tools during the construction of an oil-refining plant. The study provides an investigation of hazards caused by contractors engaged in the construction of a large oil-refining plant; the dependences of hazard occurrence on conditions, number of employees, and types of jobs have been established; key risks of construction have been identified; and risk management tools with the identification of proactive barriers reducing risk levels and reactive barriers minimizing consequences of potential accidents during the construction have been proposed. The study is based on real initial statistical data relying on the practices of successful construction of a similar facility. The construction was implemented in accordance with a typical model used by large-scale oil-refining companies: via a special general construction contractor engaging subcontractors (more than 2000 employees). The construction of the plant was time- and area-restricted. The changes in number of employees were non-stationary. The construction of the plant included the stages of pre-commissioning and commissioning. The study results and the proposed risk management tools have been tested and are valuable for organizing an occupational safety management system during the construction of large facilities.

Authors

Publication Details

Journal
Occupational Safety in Industry
Published
2024-11-01
DOI
https://doi.org/10.24000/0409-2961-2024-11-58-66
Primary Topic
Engineering Diagnostics and Reliability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Hazard Identification when Implementing a Construction Facility of Oil-Refining Plant by Contractors

С. В. Коваленко, D.S. Aleshkov
Occupational Safety in Industry
Engineering Diagnostics and Reliability
article

Hazard Identification when Implementing a Construction Facility of Oil-Refining Plant by Contractors

С. В. Коваленко, D.S. Aleshkov
article en

Abstract

The goal of the study is to develop risk management tools during the construction of an oil-refining plant. The study provides an investigation of hazards caused by contractors engaged in the construction of a large oil-refining plant; the dependences of hazard occurrence on conditions, number of employees, and types of jobs have been established; key risks of construction have been identified; and risk management tools with the identification of proactive barriers reducing risk levels and reactive barriers minimizing consequences of potential accidents during the construction have been proposed. The study is based on real initial statistical data relying on the practices of successful construction of a similar facility. The construction was implemented in accordance with a typical model used by large-scale oil-refining companies: via a special general construction contractor engaging subcontractors (more than 2000 employees). The construction of the plant was time- and area-restricted. The changes in number of employees were non-stationary. The construction of the plant included the stages of pre-commissioning and commissioning. The study results and the proposed risk management tools have been tested and are valuable for organizing an occupational safety management system during the construction of large facilities.

Occupational Safety in Industry(11)
Openalex Percentile: Top 73%
Engineering Diagnostics and Reliability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.