Enhancing programevaluation and review technique (PERT) for construction project scheduling with Bayesian updating and appropriate probability distributions

The Program Evaluation and Review Technique (PERT) is a popular scheduling technique that takes advantage of the Beta distribution to present uncertainty in activity durations. This study presents an advanced PERT method with an improved Bayesian updating and improved assumed prior distributions, which better represent real-world projects. The method is backed with detailed mathematical proofs and derivations for a solid theoretical foundation. A numerical case study involving a 30-floor building construction project is used to compare the performance of traditional PERT, the Beta-improved Bayesian PERT, and the Log-Normal Bayesian PERT methods. In the example, the activities considered are Formwork, Rebar and Construction, Masonry, Mechanical-Electrical-Plumbing (MEP), and Finishing, which are the main activities in a construction project. The results show that the Beta-improved and the Log-Normal distributions are constructed successfully in the models with converging variance – an observation that delineates the uncertainty reduced along a real project’s course. With enhanced functions, the PERT method can be utilized to support project decision-makers in scheduling and managing complex projects in reality.

Authors

Publication Details

Journal
Tạp chí Khoa học Công nghệ Xây dựng (KHCNXD) - ĐHXDHN
Published
2024-12-25
DOI
https://doi.org/10.31814/stce.huce2024-18(4)-11
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Enhancing programevaluation and review technique (PERT) for construction project scheduling with Bayesian updating and appropriate probability distributions

Nguyễn Anh Đức
Tạp chí Khoa học Công nghệ Xây dựng (KHCNXD) - ĐHXDHN
Construction Project Management and Performance
article

Enhancing programevaluation and review technique (PERT) for construction project scheduling with Bayesian updating and appropriate probability distributions

Nguyễn Anh Đức
article en

Abstract

The Program Evaluation and Review Technique (PERT) is a popular scheduling technique that takes advantage of the Beta distribution to present uncertainty in activity durations. This study presents an advanced PERT method with an improved Bayesian updating and improved assumed prior distributions, which better represent real-world projects. The method is backed with detailed mathematical proofs and derivations for a solid theoretical foundation. A numerical case study involving a 30-floor building construction project is used to compare the performance of traditional PERT, the Beta-improved Bayesian PERT, and the Log-Normal Bayesian PERT methods. In the example, the activities considered are Formwork, Rebar and Construction, Masonry, Mechanical-Electrical-Plumbing (MEP), and Finishing, which are the main activities in a construction project. The results show that the Beta-improved and the Log-Normal distributions are constructed successfully in the models with converging variance – an observation that delineates the uncertainty reduced along a real project’s course. With enhanced functions, the PERT method can be utilized to support project decision-makers in scheduling and managing complex projects in reality.

Tạp chí Khoa học Công nghệ Xây dựng (KHCNXD) - ĐHXDHNVol. 18(4)
Openalex Percentile: Top 70%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Enhancing programevaluation and review technique (PERT) for construction project scheduling with Bayesian updating and appropriate probability distributions — Nguyễn Anh Đức · Tạp chí Khoa học Công nghệ Xây dựng (KHCNXD) - ĐHXDHN (2024) | TGRS Research Map | TGRS