Development of a Baseline Digital Twin Model as a Prerequisite for the Digital Twin Definition of a PSC-I Bridge with Model Updating Considering Member Stiffness

Structural health monitoring using various sensors has been widely employed to assess the structural conditions of bridges. In addition, the concept of a digital twin was introduced, which encompasses the life cycle information of a bridge and its real-time data acquisition and utilization. However, the obtained real-time data from sensors primarily reflect the global behavior of the system, making it challenging to identify the root causes of structural changes. For a highly reliable assessment of the global behavior of a bridge, previous history information, that is, a prerequisite model, is required. This study defines a baseline digital twin model (B-DTM) as the stage preceding real-time data utilization in digital twins. The B-DTM is structured into a pre-update phase, which involves the collection of members and system historical data, and a post-update phase, which focuses on model updating. For the case of model updating, due to the inherent complexity of bridge systems, identifying the global optimum for updating remains challenging. In the pre-update phase, a probabilistic approach to historical data such as member stiffness restricts the search domain for model updating, whereas, in the post-update phase, deflection, mode shapes, and natural frequencies derived from load test results representing the real bridge’s behavior are utilized to explore the global optimum solution. The proposed B-DTM was validated using collected data and load test results from a PSC-I girder bridge decommissioned after 45 years of service.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2024-12-25
DOI
https://doi.org/10.3390/buildings15010017
Citations
2
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.70

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development of a Baseline Digital Twin Model as a Prerequisite for the Digital Twin Definition of a PSC-I Bridge with Model Updating Considering Member Stiffness

Gitae Roh, Chi-Ho Jeon, Jaewook Park, Chang-Su Shim
2 citations
Buildings
Manufacturing Process and Optimization
0.70
article

Development of a Baseline Digital Twin Model as a Prerequisite for the Digital Twin Definition of a PSC-I Bridge with Model Updating Considering Member Stiffness

Gitae Roh, Chi-Ho Jeon, Jaewook Park, Chang-Su Shim
article en
2 citations

Abstract

Structural health monitoring using various sensors has been widely employed to assess the structural conditions of bridges. In addition, the concept of a digital twin was introduced, which encompasses the life cycle information of a bridge and its real-time data acquisition and utilization. However, the obtained real-time data from sensors primarily reflect the global behavior of the system, making it challenging to identify the root causes of structural changes. For a highly reliable assessment of the global behavior of a bridge, previous history information, that is, a prerequisite model, is required. This study defines a baseline digital twin model (B-DTM) as the stage preceding real-time data utilization in digital twins. The B-DTM is structured into a pre-update phase, which involves the collection of members and system historical data, and a post-update phase, which focuses on model updating. For the case of model updating, due to the inherent complexity of bridge systems, identifying the global optimum for updating remains challenging. In the pre-update phase, a probabilistic approach to historical data such as member stiffness restricts the search domain for model updating, whereas, in the post-update phase, deflection, mode shapes, and natural frequencies derived from load test results representing the real bridge’s behavior are utilized to explore the global optimum solution. The proposed B-DTM was validated using collected data and load test results from a PSC-I girder bridge decommissioned after 45 years of service.

BuildingsVol. 15(1)
Korea Institute of Civil Engineering and Building Technology (KR), Chung-Ang University (KR)
Chung-Ang University, Ministry of Land, Infrastructure and Transport, Korea Agency for Infrastructure Technology Advancement
Responsible consumption and production
Openalex Percentile: Top 24%
Manufacturing Process and Optimization
0.70
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.