ASSESSMENT OF THE RISK OF AN ACCIDENT OF LIFTING STRUCTURES DURING THE CONSTRUCTION OF THE BRIDGE

This work is devoted to assessing the risk of an accident of lifting structures during the construction of the bridge. The object of research in this work is a SENEBOGEN 7700 jib type crawler crane, the subject of the study is an accident risk assessment. After analyzing the accident statistics when using lifting structures, the main types of defects leading to an accident were identified. With the help of the «Tree of failures» method, the probabilities of the accident occurrence were found on the SENEBOGEN 7770 boom type crawler crane when moving the pile. Then, using the method of analysis of the types, consequences and criticality of failures (FMECA), the risk priority was assessed by conducting an expert survey to identify the most dangerous of the selected types of failures and to rank these defects according to the degree of criticality for the construction object and the person. After the ranking, measures were proposed in the work that will reduce the risk of an accident at the construction site.

Authors

Institutions

Publication Details

Journal
NATURAL AND MAN-MADE RISKS (PHYSICO-MATHEMATICAL AND APPLIED ASPECTS)
Published
2024-12-25
DOI
https://doi.org/10.61260/2307-7476-2024-2023-1-25-33
Primary Topic
Occupational Health and Safety Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ASSESSMENT OF THE RISK OF AN ACCIDENT OF LIFTING STRUCTURES DURING THE CONSTRUCTION OF THE BRIDGE

V. B. Nemtsov
NATURAL AND MAN-MADE RISKS (PHYSICO-MATHEMATICAL AND APPLIED ASPECTS)
Occupational Health and Safety Research
article

ASSESSMENT OF THE RISK OF AN ACCIDENT OF LIFTING STRUCTURES DURING THE CONSTRUCTION OF THE BRIDGE

V. B. Nemtsov
article en

Abstract

This work is devoted to assessing the risk of an accident of lifting structures during the construction of the bridge. The object of research in this work is a SENEBOGEN 7700 jib type crawler crane, the subject of the study is an accident risk assessment. After analyzing the accident statistics when using lifting structures, the main types of defects leading to an accident were identified. With the help of the «Tree of failures» method, the probabilities of the accident occurrence were found on the SENEBOGEN 7770 boom type crawler crane when moving the pile. Then, using the method of analysis of the types, consequences and criticality of failures (FMECA), the risk priority was assessed by conducting an expert survey to identify the most dangerous of the selected types of failures and to rank these defects according to the degree of criticality for the construction object and the person. After the ranking, measures were proposed in the work that will reduce the risk of an accident at the construction site.

NATURAL AND MAN-MADE RISKS (PHYSICO-MATHEMATICAL AND APPLIED ASPECTS)Vol. 2023(1)
Peter the Great St. Petersburg Polytechnic University (RU)
Good health and well-being
Openalex Percentile: Top 64%
Occupational Health and Safety Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.