Optimization of the Protection Interlocking Function of a 56 MW Unit Steam Turbine

There are 2 x 56MW units in Kendari power plant, each unit is equipped with two 100% capacity electric feed pumps, one running and another one backup. During the operation of the unit, two defects, such as large vibration of the BFWP and high temperature of the thrust pad on the working face, were found to affect the operation. The large vibration of the BFWP is mainly due to the falling off of the positioning pin of the bearing bracket of the non-drive end, which causes the center to sink, and the balance drum and the balance sleeve are rubbed dynamically and statically. The main reason for the high temperature of the thrust pad of the BFWP is that the diameter of the balance drum is small, which leads to an increase in the axial thrust borne by the thrust pad of the working face, and the high temperature of the tile. This study aims to diagnose the root causes of these defects, implement corrective measures, and optimize pump performance to enhance operational safety. A combination of on-site inspections, data analysis, and engineering interventions was conducted. Findings indicate that structural realignment and reengineering of the balance drum significantly mitigated vibration and temperature issues. The study concludes that proactive maintenance and design optimization are essential for the reliable operation of power plant equipment, with implications for enhancing long-term efficiency and safety.thrust padthrust pad

Authors

Publication Details

Journal
Syntax Literate Jurnal Ilmiah Indonesia
Published
2024-12-25
DOI
https://doi.org/10.36418/syntax-literate.v9i12.55146
Primary Topic
Mechanical Failure Analysis and Simulation
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of the Protection Interlocking Function of a 56 MW Unit Steam Turbine

Muhammad Ihsan, Zhiliang Wang, Feng Hongwei
Syntax Literate Jurnal Ilmiah Indonesia
Mechanical Failure Analysis and Simulation
article

Optimization of the Protection Interlocking Function of a 56 MW Unit Steam Turbine

Muhammad Ihsan, Zhiliang Wang, Feng Hongwei
article en

Abstract

There are 2 x 56MW units in Kendari power plant, each unit is equipped with two 100% capacity electric feed pumps, one running and another one backup. During the operation of the unit, two defects, such as large vibration of the BFWP and high temperature of the thrust pad on the working face, were found to affect the operation. The large vibration of the BFWP is mainly due to the falling off of the positioning pin of the bearing bracket of the non-drive end, which causes the center to sink, and the balance drum and the balance sleeve are rubbed dynamically and statically. The main reason for the high temperature of the thrust pad of the BFWP is that the diameter of the balance drum is small, which leads to an increase in the axial thrust borne by the thrust pad of the working face, and the high temperature of the tile. This study aims to diagnose the root causes of these defects, implement corrective measures, and optimize pump performance to enhance operational safety. A combination of on-site inspections, data analysis, and engineering interventions was conducted. Findings indicate that structural realignment and reengineering of the balance drum significantly mitigated vibration and temperature issues. The study concludes that proactive maintenance and design optimization are essential for the reliable operation of power plant equipment, with implications for enhancing long-term efficiency and safety.thrust padthrust pad

Syntax Literate Jurnal Ilmiah IndonesiaVol. 9(12)
Affordable and clean energy
Openalex Percentile: Top 75%
Mechanical Failure Analysis and Simulation
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimization of the Protection Interlocking Function of a 56 MW Unit Steam Turbine — Muhammad Ihsan, Zhiliang Wang, et al. · Syntax Literate Jurnal Ilmiah Indonesia (2024) | TGRS Research Map | TGRS