ANALISIS KEBERHASILAN KERJA ULANG PINDAH LAPISAN PADA SUMUR SKW-33 LAPANGAN SUKOWATI

This study explores the effectiveness of re-perforation operations at Well SKW-33 in the Sukowati Field to enhance oil production. The background highlights the decline in production rates despite the well's initial success with natural flow since June 2015. The primary objective is to evaluate the impact of re-perforation on oil production and water cut. The research employs methods such as squeeze cementing, Cement Bond Log (CBL) analysis, well logging and subsequent re-perforation. The results demonstrate a significant increase in oil production from 100-150 barrels per day (bopd) to a peak of 305 bopd post-re-perforation. Additionally, the water cut reduced from 95-96% to 80%, indicating a successful reduction in water production. The conclusion asserts that re-perforation significantly boosts short-term oil production and reduces water production, though ongoing management is essential for maintaining long-term efficiency.

Authors

Institutions

Publication Details

Journal
Journal of Sustainable Energy Development.
Published
2024-12-24
DOI
https://doi.org/10.19184/jsed.v2i2.1603
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALISIS KEBERHASILAN KERJA ULANG PINDAH LAPISAN PADA SUMUR SKW-33 LAPANGAN SUKOWATI

Hadziqul Abror, Desyana Nindya Prastiwi, Babas samudera Hafwandi
Journal of Sustainable Energy Development.
Oil and Gas Production Techniques
article

ANALISIS KEBERHASILAN KERJA ULANG PINDAH LAPISAN PADA SUMUR SKW-33 LAPANGAN SUKOWATI

Hadziqul Abror, Desyana Nindya Prastiwi, Babas samudera Hafwandi
article en

Abstract

This study explores the effectiveness of re-perforation operations at Well SKW-33 in the Sukowati Field to enhance oil production. The background highlights the decline in production rates despite the well's initial success with natural flow since June 2015. The primary objective is to evaluate the impact of re-perforation on oil production and water cut. The research employs methods such as squeeze cementing, Cement Bond Log (CBL) analysis, well logging and subsequent re-perforation. The results demonstrate a significant increase in oil production from 100-150 barrels per day (bopd) to a peak of 305 bopd post-re-perforation. Additionally, the water cut reduced from 95-96% to 80%, indicating a successful reduction in water production. The conclusion asserts that re-perforation significantly boosts short-term oil production and reduces water production, though ongoing management is essential for maintaining long-term efficiency.

Journal of Sustainable Energy Development.Vol. 2(2)
Universitas Jember (ID)
Clean water and sanitation
Openalex Percentile: Top 68%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.