PERENCANAAN TEMPAT PEMROSESAN AKHIR (TPA) SAMPAH KABUPATEN BARITO KUALA DENGAN SISITEM ANAEROBIC BIOREACTOR LANDFILL (ABL)

The rapid population and economic growth, along with ongoing development, have both positive and negativeimpacts on society, including environmental damage due to waste. TPA Tabing Rimbah is nearing capacity, requiring expansion or a new landfill. The objective is to determine the waste weight in TPA Tabing Rimbah and plan an Anaerobic Bioreactor Landfill (ABL) system. Over a 10-year period (2022-2031), an estimated 954,677.49 m3 of waste will accumulate. The planned blocks consist of 2 landfill blocks at 12 meters height. After recirculation,block 1 has 468.17 m3/day, and block 2 has 886.99 m3/day, treated using biological methods in a leachate treatment facility(IPL). Landfill gas reaches 0.846 m3/day, which, if utilized for electricity, generates 4.016 MW power.

Authors

Institutions

Publication Details

Journal
Jernih Jurnal Tugas Akhir Mahasiswa
Published
2024-09-30
DOI
https://doi.org/10.20527/jernih.v7i1.1885
Primary Topic
Edcuational Technology Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PERENCANAAN TEMPAT PEMROSESAN AKHIR (TPA) SAMPAH KABUPATEN BARITO KUALA DENGAN SISITEM ANAEROBIC BIOREACTOR LANDFILL (ABL)

Azmul Gazali Fikri
Jernih Jurnal Tugas Akhir Mahasiswa
Edcuational Technology Systems
article

PERENCANAAN TEMPAT PEMROSESAN AKHIR (TPA) SAMPAH KABUPATEN BARITO KUALA DENGAN SISITEM ANAEROBIC BIOREACTOR LANDFILL (ABL)

Azmul Gazali Fikri
article en

Abstract

The rapid population and economic growth, along with ongoing development, have both positive and negativeimpacts on society, including environmental damage due to waste. TPA Tabing Rimbah is nearing capacity, requiring expansion or a new landfill. The objective is to determine the waste weight in TPA Tabing Rimbah and plan an Anaerobic Bioreactor Landfill (ABL) system. Over a 10-year period (2022-2031), an estimated 954,677.49 m3 of waste will accumulate. The planned blocks consist of 2 landfill blocks at 12 meters height. After recirculation,block 1 has 468.17 m3/day, and block 2 has 886.99 m3/day, treated using biological methods in a leachate treatment facility(IPL). Landfill gas reaches 0.846 m3/day, which, if utilized for electricity, generates 4.016 MW power.

Jernih Jurnal Tugas Akhir MahasiswaVol. 7(1)
Lambung Mangkurat University (ID)
Openalex Percentile: Top 78%
Edcuational Technology Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.