Mission-Profile Based Reliability Assessment of Grid Integrated Photovoltaic System Installed in the United Arab Emirates

The reliability of power electronic converters in a photovoltaic system has become major concern to extend its power transfer capability. In this regard, this work conducts a mission-profile-based reliability assessment of a 6-kW, two-stage, grid-integrated photovoltaic system installed in the United Arab Emirates. This study considers the failure of power switches in the dc-dc (boost) converter and dc-ac inverter, and the failure of the dc-link capacitor. This investigation uncovered that the dc-link capacitor exhibits the highest susceptibility to failure within the system, with the switches of the dc-dc converter and PV inverter following closely behind. Overall, the PV system has a B10 lifetime of 09 years in UAE. However, the overall lifetime of the system can be improved further by applying various control strategies to manage the thermal load of the power devices.

Authors

Institutions

Publication Details

Published
2024-11-04
DOI
https://doi.org/10.1109/ieacon61321.2024.10797280
Citations
1
Primary Topic
Power System Reliability and Maintenance
Type
article
Field-Weighted Citation Impact
0.36
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mission-Profile Based Reliability Assessment of Grid Integrated Photovoltaic System Installed in the United Arab Emirates

Hussain Shareef, Amar Hasan Hameed, Sankar Peddapati, SVK Naresh et al.
1 citations
Power System Reliability and Maintenance
0.36
article

Mission-Profile Based Reliability Assessment of Grid Integrated Photovoltaic System Installed in the United Arab Emirates

Hussain Shareef, Amar Hasan Hameed, Sankar Peddapati, SVK Naresh, Ibrahim Nizam, Rashed Saif Alketbi, Hamdan Mohamed Al-Ali, Abdulla Ali Abdulla Almansoor
article en
1 citations

Abstract

The reliability of power electronic converters in a photovoltaic system has become major concern to extend its power transfer capability. In this regard, this work conducts a mission-profile-based reliability assessment of a 6-kW, two-stage, grid-integrated photovoltaic system installed in the United Arab Emirates. This study considers the failure of power switches in the dc-dc (boost) converter and dc-ac inverter, and the failure of the dc-link capacitor. This investigation uncovered that the dc-link capacitor exhibits the highest susceptibility to failure within the system, with the switches of the dc-dc converter and PV inverter following closely behind. Overall, the PV system has a B10 lifetime of 09 years in UAE. However, the overall lifetime of the system can be improved further by applying various control strategies to manage the thermal load of the power devices.

United Arab Emirates University (AE), National Institute of Technology Andhra Pradesh (IN)
Affordable and clean energy
Openalex Percentile: Top 36%
Power System Reliability and Maintenance
0.36
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.