Life cycle requirement time optimization of a construction project

Due to the fact that currently there are no regulated stages of the life cycle of the construction project, in the article we propose a model of 3 stages: pre-design, design and execution stage of construction-installation works. Each of the stages is considered step by step, identified reasons that may affect the time of completion. The importance of linkages between project life cycle stages is noted: reducing the time gap between phases and working in parallel on different phases affect project completion times and costs. Planning and project management allows to optimize work.

Authors

Publication Details

Journal
Construction and Architecture
Published
2024-12-24
DOI
https://doi.org/10.29039/2308-0191-2024-12-4-6-6
Citations
2
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.53
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Life cycle requirement time optimization of a construction project

Mariya Zhdanova, Azariy Lapidus
2 citations
Construction and Architecture
BIM and Construction Integration
0.53
article

Life cycle requirement time optimization of a construction project

Mariya Zhdanova, Azariy Lapidus
article en
2 citations

Abstract

Due to the fact that currently there are no regulated stages of the life cycle of the construction project, in the article we propose a model of 3 stages: pre-design, design and execution stage of construction-installation works. Each of the stages is considered step by step, identified reasons that may affect the time of completion. The importance of linkages between project life cycle stages is noted: reducing the time gap between phases and working in parallel on different phases affect project completion times and costs. Planning and project management allows to optimize work.

Construction and ArchitectureVol. 12(4)
Responsible consumption and production
Openalex Percentile: Top 32%
BIM and Construction Integration
0.53
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Life cycle requirement time optimization of a construction project — Mariya Zhdanova, Azariy Lapidus · Construction and Architecture (2024) | TGRS Research Map | TGRS