Efficiency in real estate development: Is management or robotics the key?

This study examines the impact of construction robotics (CR) and agile project management (APM) principles on operational efficiency in Chinese commercial residential projects (CRPs). By analyzing 107 CRPs across 21 provinces, including 30 using CR technology, we employ a novel methodology that combines superefficiency SBM-DEA, APM frameworks, and Tobit regression models. The results show that CR implementation improved work efficiency by 2.59% on average. Operational efficiency varied regionally, with the eastern area (mean 0.3963) outperforming the central (0.3651) and western (0.3790) areas. The provinces of Jiangsu and Shanghai demonstrated the highest efficiencies. APM factors significantly influence efficiency: top management commitment negatively (−0.9432) and product owner involvement positively (0.2266). CR implementation in the main structural phase showed the strongest positive correlation (0.0438). Three of the nine typical CR technologies on the project duration's critical path were the most popular among the contractors. The study identified potential improvements in interim payments and inventory balance efficiency. The findings extend APM theory to real estate development, refine technology adoption models in construction, and reveal tensions between contractor priorities and overall project efficiency. Practical implications include recommendations for targeted CR implementation, management restructuring, and policy support. Future research should explore longitudinal effects, broader geographic scopes, and potential mediating variables in CR and APM dynamics in real estate development.

Authors

Institutions

Publication Details

Journal
Asia Pacific Management Review
Published
2024-12-23
DOI
https://doi.org/10.1016/j.apmrv.2024.12.005
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.27

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Efficiency in real estate development: Is management or robotics the key?

Aidi Hizami Alias, Yuming Liu, Nuzul Azam Haron, Nabilah Abu Bakar et al.
1 citations
Asia Pacific Management Review
BIM and Construction Integration
0.27
article

Efficiency in real estate development: Is management or robotics the key?

Aidi Hizami Alias, Yuming Liu, Nuzul Azam Haron, Nabilah Abu Bakar, Hao Wang
article en
1 citations

Abstract

This study examines the impact of construction robotics (CR) and agile project management (APM) principles on operational efficiency in Chinese commercial residential projects (CRPs). By analyzing 107 CRPs across 21 provinces, including 30 using CR technology, we employ a novel methodology that combines superefficiency SBM-DEA, APM frameworks, and Tobit regression models. The results show that CR implementation improved work efficiency by 2.59% on average. Operational efficiency varied regionally, with the eastern area (mean 0.3963) outperforming the central (0.3651) and western (0.3790) areas. The provinces of Jiangsu and Shanghai demonstrated the highest efficiencies. APM factors significantly influence efficiency: top management commitment negatively (−0.9432) and product owner involvement positively (0.2266). CR implementation in the main structural phase showed the strongest positive correlation (0.0438). Three of the nine typical CR technologies on the project duration's critical path were the most popular among the contractors. The study identified potential improvements in interim payments and inventory balance efficiency. The findings extend APM theory to real estate development, refine technology adoption models in construction, and reveal tensions between contractor priorities and overall project efficiency. Practical implications include recommendations for targeted CR implementation, management restructuring, and policy support. Future research should explore longitudinal effects, broader geographic scopes, and potential mediating variables in CR and APM dynamics in real estate development.

Asia Pacific Management ReviewVol. 30(1)
Universiti Putra Malaysia (MY), Ji Hua Laboratory (CN)
Universiti Putra Malaysia
Decent work and economic growth
Openalex Percentile: Top 40%
BIM and Construction Integration
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.