Symbolic value and embeddedness of an industrial megaproject: Tesla’s Gigafactory Berlin-Brandenburg

Abstract Large-scale industrial settlements, such as the establishment of multinational enterprise (MNE) subsidiaries, are megaprojects that face additional challenges when embedding the subsidiary in the region. Part of these challenges may be due to contrasting symbolic values of the industrial project, which can facilitate or hinder embeddedness. This study considers the relevance of symbolic value for the embeddedness of an industrial megaproject through the case of Tesla’s Gigafactory Berlin-Brandenburg. Based on 23 interviews, we examine differences in the symbolic representation of the project among stakeholder groups and show that symbolic value can have supportive or divisive effects on the settlement process and embeddedness.

Authors

Institutions

Publication Details

Journal
Cambridge Journal of Regions Economy and Society
Published
2024-12-23
DOI
https://doi.org/10.1093/cjres/rsae045
Citations
3
Primary Topic
Management and Organizational Studies
Type
article
Field-Weighted Citation Impact
2.02
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Symbolic value and embeddedness of an industrial megaproject: Tesla’s Gigafactory Berlin-Brandenburg

Daniel Schiller, Paula Prenzel, Max Roessler
3 citations
Cambridge Journal of Regions Economy and Society
Management and Organizational Studies
2.02
article

Symbolic value and embeddedness of an industrial megaproject: Tesla’s Gigafactory Berlin-Brandenburg

Daniel Schiller, Paula Prenzel, Max Roessler
article en
3 citations

Abstract

Abstract Large-scale industrial settlements, such as the establishment of multinational enterprise (MNE) subsidiaries, are megaprojects that face additional challenges when embedding the subsidiary in the region. Part of these challenges may be due to contrasting symbolic values of the industrial project, which can facilitate or hinder embeddedness. This study considers the relevance of symbolic value for the embeddedness of an industrial megaproject through the case of Tesla’s Gigafactory Berlin-Brandenburg. Based on 23 interviews, we examine differences in the symbolic representation of the project among stakeholder groups and show that symbolic value can have supportive or divisive effects on the settlement process and embeddedness.

Cambridge Journal of Regions Economy and SocietyVol. 18(2)
Universität Greifswald (DE), V. B. Sochava Institute of Geography (RU)
Openalex Percentile: Top 11%
Management and Organizational Studies
2.02
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.