Analisis Risiko the Lowest Bid Method dalam Public Procurement di Kementerian Keuangan

Purpose: This study provides a detailed analysis of the advantages and disadvantages of using the lowest bid price method in public tenders. Research methodology: This study uses a quantitative method. This study uses a questionnaire survey, then the data from the questionnaire is analyzed using the Relative Importance Index (RII). This study also analyzes descriptive statistics on construction procurement data. Results: The findings indicate that the lowest bid method has several benefits, including increasing competition and transparency in the selection process. However, there are also some shortcomings that management should understand. Limitations: The study is limited by its focus on cases within the Ministry of Finance in Indonesia and the use of self-reported data from questionnaires, which may differ from practices in other contexts. The data used in this study comes from a certain period of time, so it can’t explain all procurement performance. Contribution: The research contributes to the fields of public construction procurement.

Authors

Institutions

Publication Details

Journal
Jurnal Akuntansi Keuangan dan Manajemen
Published
2024-12-11
DOI
https://doi.org/10.35912/jakman.v6i1.3616
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Risiko the Lowest Bid Method dalam Public Procurement di Kementerian Keuangan

Zanuar Arifin, Arviansyah Arviansyah
Jurnal Akuntansi Keuangan dan Manajemen
Management and Optimization Techniques
article

Analisis Risiko the Lowest Bid Method dalam Public Procurement di Kementerian Keuangan

Zanuar Arifin, Arviansyah Arviansyah
article en

Abstract

Purpose: This study provides a detailed analysis of the advantages and disadvantages of using the lowest bid price method in public tenders. Research methodology: This study uses a quantitative method. This study uses a questionnaire survey, then the data from the questionnaire is analyzed using the Relative Importance Index (RII). This study also analyzes descriptive statistics on construction procurement data. Results: The findings indicate that the lowest bid method has several benefits, including increasing competition and transparency in the selection process. However, there are also some shortcomings that management should understand. Limitations: The study is limited by its focus on cases within the Ministry of Finance in Indonesia and the use of self-reported data from questionnaires, which may differ from practices in other contexts. The data used in this study comes from a certain period of time, so it can’t explain all procurement performance. Contribution: The research contributes to the fields of public construction procurement.

Jurnal Akuntansi Keuangan dan ManajemenVol. 6(1)
University of Indonesia (ID)
Partnerships for the goals
Openalex Percentile: Top 58%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisis Risiko the Lowest Bid Method dalam Public Procurement di Kementerian Keuangan — Zanuar Arifin, Arviansyah Arviansyah · Jurnal Akuntansi Keuangan dan Manajemen (2024) | TGRS Research Map | TGRS