Transformer–BiLSTM Fusion Neural Network for Short-Term PV Output Prediction Based on NRBO Algorithm and VMD

In order to solve the difficulties that the uncertain characteristics of PV output, such as volatility and intermittency, will bring to the development of microgrid scheduling plans, this paper proposes a Transformer–Bidirectional Long Short-Term Memory (BiLSTM) neural network PV power generation forecasting fusion model based on the Newton–Raphson optimization algorithm (NRBO) and Variational Modal Decomposition (VMD). Firstly, the principle of the VMD technique and the Gray Wolf Optimization (GWO) algorithm’s key parameter optimization method for VMD are introduced. Then, the Transformer decoder partially fuses the BiLSTM network and retains the encoder to obtain the body of the prediction model, followed by explaining the principle of the NRBO algorithm. And finally, the VMD-NRBO-Transformer-BiLSTM prediction model and hyperparameter selection are evaluated by the NRBO algorithm. The algorithm sets up a multi-model comparison experiment, and the results show that the prediction model proposed in this paper has the best prediction accuracy and the optimal evaluation index.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2024-12-21
DOI
https://doi.org/10.3390/app142411991
Citations
10
Primary Topic
Smart Grid and Power Systems
Type
article
Field-Weighted Citation Impact
2.09
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Transformer–BiLSTM Fusion Neural Network for Short-Term PV Output Prediction Based on NRBO Algorithm and VMD

Rong‐Long Wang, Jingang Wang, Xiao‐Wei Fan, Yi Yang
10 citations
Applied Sciences
Smart Grid and Power Systems
2.09
article

Transformer–BiLSTM Fusion Neural Network for Short-Term PV Output Prediction Based on NRBO Algorithm and VMD

Rong‐Long Wang, Jingang Wang, Xiao‐Wei Fan, Yi Yang
article en
10 citations

Abstract

In order to solve the difficulties that the uncertain characteristics of PV output, such as volatility and intermittency, will bring to the development of microgrid scheduling plans, this paper proposes a Transformer–Bidirectional Long Short-Term Memory (BiLSTM) neural network PV power generation forecasting fusion model based on the Newton–Raphson optimization algorithm (NRBO) and Variational Modal Decomposition (VMD). Firstly, the principle of the VMD technique and the Gray Wolf Optimization (GWO) algorithm’s key parameter optimization method for VMD are introduced. Then, the Transformer decoder partially fuses the BiLSTM network and retains the encoder to obtain the body of the prediction model, followed by explaining the principle of the NRBO algorithm. And finally, the VMD-NRBO-Transformer-BiLSTM prediction model and hyperparameter selection are evaluated by the NRBO algorithm. The algorithm sets up a multi-model comparison experiment, and the results show that the prediction model proposed in this paper has the best prediction accuracy and the optimal evaluation index.

Applied SciencesVol. 14(24)
Chongqing University (CN), Shanghai Electric (China) (CN)
Openalex Percentile: Top 12%
Smart Grid and Power Systems
2.09
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.