Slope Stability Assessment of Tailings Dam

The paper examines a complex methodology for calculating the slope stability of a tailing storage facility based on comparing the results obtained through deterministic and probabilistic approaches. The analysis is performed in GeoStudio software, based on the limit equilibrium method, and with a probabilistic approach that uses a Monte Carlo simulation to compute a probability distribution of the resulting factor of safety. A slope stability assessment of tailing dam was conducted on the example of Ferrexpo Poltava Mining, and a conclusion was reached about their reliability and safety. The results of the deterministic analysis showed that the calculated factor of safety is by those established in Ukrainian regulatory standards. It has been recognized that the factor of safety is not a consistent measure of risk for tailings dam. Considering the variability inherent in the soil materials of tailings dam is a way to achieve more accurate results. The importance of obtaining a failure probability and a reliability index due to tailing dam stability was highlighted by comparing deterministic and probabilistic approaches.

Authors

Institutions

Publication Details

Journal
Key engineering materials
Published
2024-12-23
DOI
https://doi.org/10.4028/p-mhh85g
Citations
3
Primary Topic
Tailings Management and Properties
Type
article
Field-Weighted Citation Impact
0.78
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Slope Stability Assessment of Tailings Dam

O Radchuk
3 citations
Key engineering materials
Tailings Management and Properties
0.78
article

Slope Stability Assessment of Tailings Dam

O Radchuk
article en
3 citations

Abstract

The paper examines a complex methodology for calculating the slope stability of a tailing storage facility based on comparing the results obtained through deterministic and probabilistic approaches. The analysis is performed in GeoStudio software, based on the limit equilibrium method, and with a probabilistic approach that uses a Monte Carlo simulation to compute a probability distribution of the resulting factor of safety. A slope stability assessment of tailing dam was conducted on the example of Ferrexpo Poltava Mining, and a conclusion was reached about their reliability and safety. The results of the deterministic analysis showed that the calculated factor of safety is by those established in Ukrainian regulatory standards. It has been recognized that the factor of safety is not a consistent measure of risk for tailings dam. Considering the variability inherent in the soil materials of tailings dam is a way to achieve more accurate results. The importance of obtaining a failure probability and a reliability index due to tailing dam stability was highlighted by comparing deterministic and probabilistic approaches.

Key engineering materialsVol. 1004
Multichannel (China) (CN)
Life in Land
Openalex Percentile: Top 29%
Tailings Management and Properties
0.78
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Slope Stability Assessment of Tailings Dam — O Radchuk · Key engineering materials (2024) | TGRS Research Map | TGRS