ANALISIS STABILITAS TIMBUNAN PROYEK PEMBANGUNAN JALUR GANDA JALAN KERETA API (KA) SEPANJANG-MOJOKERTO
The construction of the Sepanjang-Mojokerto railway double track is an initiative to address the growing demand for railway transportation infrastructure. During the building of the double-track railroad, it is anticipated that the rail structure will endure the weight of traversing trains; hence, a stability study for settlement and sliding is essential. The settlement of the embankment between KM 49+500 and KM 49+750 was studied using sondir and borlog correlation data and then a geoslope model to see how stable the embankment was against sliding. The calculated findings indicate a reduction of 0.49 m to 1.49 m. The decrease is unsafe as it is above the permissible limit of 20 cm; achieving a decline to U90% requires around 0.9 years—15 years. Consequently, it is imperative to expedite the reduction using PVD and preloading. The PVD installation employs a triangle configuration with a spacing of 1.5 meters, requiring a duration of 16 to 20 weeks to achieve a 90% reduction. The stability control of the embankment against sliding on the railroad body yielded a safety factor (SF) value ranging from 1.63 to 2.33. SF > 1.5 indicates that the SF value is secure, surpassing the permissible threshold.
Authors
- Ovilia Wulan Anggarita
- Paksitya Putra Purnama
- Indra Nurtjahjaningtyas
- Rini Trisno Lestari
Institutions
- Pancasila University (ID)
- Universitas Jember (ID)
Publication Details
- Journal
- Construction and Material Journal
- Published
- 2024-12-23
- DOI
- https://doi.org/10.32722/cmj.v6i2.6630
- Primary Topic
- Urban Transport Systems Analysis
- Type
- article
- Field-Weighted Citation Impact
- 0.00