Load Transfer and Performance Evaluation of the Composite Foundation Reinforced by Penetrated PCCSs and Partially Penetrated DCM Columns under Embankment Loads

The geosynthetic-reinforced and pile-supported (GRPS) embankment is a cost-effective and efficient method for addressing soft soil conditions. A noteworthy addition to this approach is the introduction of a precast concrete pile reinforced with cement-treated soil (PCCS), a novel composite pile formed by inserting a precast concrete (PC) pile into a deep cement mixing (DCM) column. This research aimed to delve into the bearing mechanism and deformation characteristics of a multielement composite foundation featuring PCCSs (long piles) and partially penetrated DCM columns (short columns) under embankment loads. Furthermore, the study performed a comparative analysis, juxtaposing calculated stress reduction values obtained from eight existing analytical methods with both field data and numerical results. The findings underscore the efficacy of the long-short pile composite foundation in effectively controlling settlements under embankment loads. Specifically, the maximum settlements recorded for the PCCS, the DCM column, and the surrounding soil within the piled-supported embankment system were 11.6, 19.0, and 54.0 mm, respectively. Under undrained end-of-construction conditions, the stable stress ratios of the PCCS–soil and the DCM column–soil were 10.7 and 4.5, respectively. As the loads transition from the surrounding soil to the piles, a major arch and a minor arch gradually form between the adjacent PCCSs and PCCS–DCM columns within the embankment filling. The outcomes of this investigation indicate that incorporating PCCSs and DCM columns as composite piles in GRPS embankments significantly enhances bearing capacity and curtails deformation under embankment loads.

Authors

Institutions

Publication Details

Journal
International Journal of Geomechanics
Published
2024-12-23
DOI
https://doi.org/10.1061/ijgnai.gmeng-10204
Citations
7
Primary Topic
Geotechnical Engineering and Soil Stabilization
Type
article
Field-Weighted Citation Impact
1.83
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Load Transfer and Performance Evaluation of the Composite Foundation Reinforced by Penetrated PCCSs and Partially Penetrated DCM Columns under Embankment Loads

Yizhao Liu, Pan Zhou, Songyu Liu, Chaozhe Zhang et al.
7 citations
International Journal of Geomechanics
Geotechnical Engineering and Soil Stabilization
1.83
article

Load Transfer and Performance Evaluation of the Composite Foundation Reinforced by Penetrated PCCSs and Partially Penetrated DCM Columns under Embankment Loads

Yizhao Liu, Pan Zhou, Songyu Liu, Chaozhe Zhang, Dingwen Zhang, Yanxiao Sun
article en
7 citations

Abstract

The geosynthetic-reinforced and pile-supported (GRPS) embankment is a cost-effective and efficient method for addressing soft soil conditions. A noteworthy addition to this approach is the introduction of a precast concrete pile reinforced with cement-treated soil (PCCS), a novel composite pile formed by inserting a precast concrete (PC) pile into a deep cement mixing (DCM) column. This research aimed to delve into the bearing mechanism and deformation characteristics of a multielement composite foundation featuring PCCSs (long piles) and partially penetrated DCM columns (short columns) under embankment loads. Furthermore, the study performed a comparative analysis, juxtaposing calculated stress reduction values obtained from eight existing analytical methods with both field data and numerical results. The findings underscore the efficacy of the long-short pile composite foundation in effectively controlling settlements under embankment loads. Specifically, the maximum settlements recorded for the PCCS, the DCM column, and the surrounding soil within the piled-supported embankment system were 11.6, 19.0, and 54.0 mm, respectively. Under undrained end-of-construction conditions, the stable stress ratios of the PCCS–soil and the DCM column–soil were 10.7 and 4.5, respectively. As the loads transition from the surrounding soil to the piles, a major arch and a minor arch gradually form between the adjacent PCCSs and PCCS–DCM columns within the embankment filling. The outcomes of this investigation indicate that incorporating PCCSs and DCM columns as composite piles in GRPS embankments significantly enhances bearing capacity and curtails deformation under embankment loads.

International Journal of GeomechanicsVol. 25(3)
Tongji University (CN), Nanjing University of Science and Technology (CN), Southeast University (BD), Technical University of Munich (DE)
Sustainable cities and communities
Openalex Percentile: Top 16%
Geotechnical Engineering and Soil Stabilization
1.83
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.