Optimal Thermal Output of an Absorption Heat Pump with Steam Heating Integrated in a PT-60/70-130/13 Steam Turbine

The problem of determining the optimal thermal power of the absorption bromide-lithium heat pump (AHP) with steam heating, integrated into the thermal scheme of the PT-60/70-130/13 steam turbine when operating in the mode with a slight opening of the rotary regulating diaphragm, was formulated and solved. The turbine plant released steam to consumers and provided heat according to the schedule of 150 / 70 ºС. The characteristics of AHP were modeled using approximate dependencies based on the characteristics of thermotransformer manufacturers. AHP was heated by steam from the production selection of the turbine after the steam screw machine installed for energy saving. The general optimization problem with the objective function of changing the monthly fuel consumption after the integration of AHP, based on the average monthly outdoor air temperature in the heating season in Ukraine, was divided into 6 auxiliary optimization problems. The control parameters of these problems were: thermal capacity of the AHP, steam pressure in the turbine condenser and at the inlet to the heat pump, steam pressure in the turbine headю These problems were solved by the coordinate descent method. Modes with steam consumption in the production selection of the turbine for the consumers were studied: 15, 30 and 45 t/h (with parameters: 1.296 MPa, 280 ºС) and mains water: 1600, 1650 and 1700 m3/h. Their feature is the provision of "useful" generation in volumes corresponding to the work of PT-60/70-130/13 without AHP with a closed rotary diaphragm. For all considered options of the turbine load, the optimal power of the integrated AHP is defined as 20 MW. During the heating period PT-60/70-130/13 with AHP 20 MW when operating in a mode close to the thermal load with the lower of the studied consumptions of production steam and mains water leads to savings of: fuel by ~3.5%, softened water by 8.5%, technical of water by 79.9%, as well as to a noticeable ecological effect due to the reduction of harmful emissions into the atmosphere. The preliminary payback period of AHP is close to 3 years. It is noted that the option of the integrated turbine with a partially open regulating diaphragm at the accepted prices for fuel and electricity loses in terms of economic indicators to the option with a closed diaphragm.

Authors

Publication Details

Journal
Journal of Mechanical Engineering
Published
2024-12-22
DOI
https://doi.org/10.15407/pmach2024.04.059
Citations
1
Primary Topic
Advanced Power Generation Technologies
Type
article
Field-Weighted Citation Impact
0.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimal Thermal Output of an Absorption Heat Pump with Steam Heating Integrated in a PT-60/70-130/13 Steam Turbine

Oleksandr Shubenko, Victoria Tarasova, Mykola Yu. Babak, Oleksii Yu. Boiarshynov
1 citations
Journal of Mechanical Engineering
Advanced Power Generation Technologies
0.21
article

Optimal Thermal Output of an Absorption Heat Pump with Steam Heating Integrated in a PT-60/70-130/13 Steam Turbine

Oleksandr Shubenko, Victoria Tarasova, Mykola Yu. Babak, Oleksii Yu. Boiarshynov
article en
1 citations

Abstract

The problem of determining the optimal thermal power of the absorption bromide-lithium heat pump (AHP) with steam heating, integrated into the thermal scheme of the PT-60/70-130/13 steam turbine when operating in the mode with a slight opening of the rotary regulating diaphragm, was formulated and solved. The turbine plant released steam to consumers and provided heat according to the schedule of 150 / 70 ºС. The characteristics of AHP were modeled using approximate dependencies based on the characteristics of thermotransformer manufacturers. AHP was heated by steam from the production selection of the turbine after the steam screw machine installed for energy saving. The general optimization problem with the objective function of changing the monthly fuel consumption after the integration of AHP, based on the average monthly outdoor air temperature in the heating season in Ukraine, was divided into 6 auxiliary optimization problems. The control parameters of these problems were: thermal capacity of the AHP, steam pressure in the turbine condenser and at the inlet to the heat pump, steam pressure in the turbine headю These problems were solved by the coordinate descent method. Modes with steam consumption in the production selection of the turbine for the consumers were studied: 15, 30 and 45 t/h (with parameters: 1.296 MPa, 280 ºС) and mains water: 1600, 1650 and 1700 m3/h. Their feature is the provision of "useful" generation in volumes corresponding to the work of PT-60/70-130/13 without AHP with a closed rotary diaphragm. For all considered options of the turbine load, the optimal power of the integrated AHP is defined as 20 MW. During the heating period PT-60/70-130/13 with AHP 20 MW when operating in a mode close to the thermal load with the lower of the studied consumptions of production steam and mains water leads to savings of: fuel by ~3.5%, softened water by 8.5%, technical of water by 79.9%, as well as to a noticeable ecological effect due to the reduction of harmful emissions into the atmosphere. The preliminary payback period of AHP is close to 3 years. It is noted that the option of the integrated turbine with a partially open regulating diaphragm at the accepted prices for fuel and electricity loses in terms of economic indicators to the option with a closed diaphragm.

Journal of Mechanical EngineeringVol. 27(4)
Affordable and clean energy
Openalex Percentile: Top 45%
Advanced Power Generation Technologies
0.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.