Construction Projects Duration Derivatives, Correlations Analysis Justified by Frequency Count and Questionnaire

The performance of construction projects is often measured by the triad of cost, quality, and time. However, many projects fail to meet these criteria, leading to significant cost overruns and delays. This research investigates the micro-level factors contributing to time and cost overruns in construction projects. Utilising a mixed-methods approach, the study combines qualitative data from a comprehensive survey of field professionals and quantitative data from a detailed case study of a hospital construction project in northern Jordan. The findings reveal that changes during the project lifecycle, particularly those stemming from requirement modifications and miscommunication, are the primary drivers of delays. While the number of workforce personnel influences activity duration, its impact is secondary to that of changes. The study underscores the critical need for effective change management and communication strategies to mitigate delays and enhance project performance. These insights offer valuable contributions to the construction industry, providing practical recommendations for improving project outcomes through better management practices. The research emphasizes the importance of workforce quality, skill, and contractual arrangements, thereby presenting a comprehensive analysis of the factors affecting construction project success.

Authors

Publication Details

Journal
SEA - Practical Application of Science
Published
2024-12-20
DOI
https://doi.org/10.70147/s36229241
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Construction Projects Duration Derivatives, Correlations Analysis Justified by Frequency Count and Questionnaire

Zaid B. Owais
SEA - Practical Application of Science
Construction Project Management and Performance
article

Construction Projects Duration Derivatives, Correlations Analysis Justified by Frequency Count and Questionnaire

Zaid B. Owais
article en

Abstract

The performance of construction projects is often measured by the triad of cost, quality, and time. However, many projects fail to meet these criteria, leading to significant cost overruns and delays. This research investigates the micro-level factors contributing to time and cost overruns in construction projects. Utilising a mixed-methods approach, the study combines qualitative data from a comprehensive survey of field professionals and quantitative data from a detailed case study of a hospital construction project in northern Jordan. The findings reveal that changes during the project lifecycle, particularly those stemming from requirement modifications and miscommunication, are the primary drivers of delays. While the number of workforce personnel influences activity duration, its impact is secondary to that of changes. The study underscores the critical need for effective change management and communication strategies to mitigate delays and enhance project performance. These insights offer valuable contributions to the construction industry, providing practical recommendations for improving project outcomes through better management practices. The research emphasizes the importance of workforce quality, skill, and contractual arrangements, thereby presenting a comprehensive analysis of the factors affecting construction project success.

SEA - Practical Application of ScienceVol. XII(36)
Openalex Percentile: Top 71%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Construction Projects Duration Derivatives, Correlations Analysis Justified by Frequency Count and Questionnaire — Zaid B. Owais · SEA - Practical Application of Science (2024) | TGRS Research Map | TGRS