Preliminary Logistics Performance Framework in Malaysia’s Construction Industry

The relationship between logistics management in construction projects and how performance can be improved to help the construction project holistically is studied in this study using qualitative methods. A semi-structured interview session was conducted to ensure that the respondents were representative of relevant areas of responsibility. The data collected was analysed using a thematic analysis approach where at the beginning there were six (6) factors that had been identified that could improve logistics performance in construction projects. However, from these six (6) factors, only three (3) new main themes and three (3) sub-themes are new findings. The results of this finding can help related organizations to ensure that it can affect the performance of construction logistics or affect its achievements in Malaysia. It is hoped that the positive findings of this study can contribute to the acquisition of current research knowledge and will offer suggestions for future research.

Authors

Institutions

Publication Details

Journal
Semarak International Journal of Transportation and Logistics
Published
2024-12-15
DOI
https://doi.org/10.37934/sijtl.1.1.2229
Primary Topic
Outsourcing and Supply Chain Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Preliminary Logistics Performance Framework in Malaysia’s Construction Industry

Bernardus Yuliarto Nugroho, S. Sarifah Radiah Shariff, Mohd. Faiz Aini, Nasruddin Faisol et al.
Semarak International Journal of Transportation and Logistics
Outsourcing and Supply Chain Management
article

Preliminary Logistics Performance Framework in Malaysia’s Construction Industry

Bernardus Yuliarto Nugroho, S. Sarifah Radiah Shariff, Mohd. Faiz Aini, Nasruddin Faisol, Norfashiha Hashim
article en

Abstract

The relationship between logistics management in construction projects and how performance can be improved to help the construction project holistically is studied in this study using qualitative methods. A semi-structured interview session was conducted to ensure that the respondents were representative of relevant areas of responsibility. The data collected was analysed using a thematic analysis approach where at the beginning there were six (6) factors that had been identified that could improve logistics performance in construction projects. However, from these six (6) factors, only three (3) new main themes and three (3) sub-themes are new findings. The results of this finding can help related organizations to ensure that it can affect the performance of construction logistics or affect its achievements in Malaysia. It is hoped that the positive findings of this study can contribute to the acquisition of current research knowledge and will offer suggestions for future research.

Semarak International Journal of Transportation and LogisticsVol. 1(1)
University of Indonesia (ID), Universiti Teknologi MARA (MY)
Industry, innovation and infrastructure
Openalex Percentile: Top 63%
Outsourcing and Supply Chain Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Preliminary Logistics Performance Framework in Malaysia’s Construction Industry — Bernardus Yuliarto Nugroho, S. Sarifah Radiah Shariff, et al. · Semarak International Journal of Transportation and Logistics (2024) | TGRS Research Map | TGRS