Research on Power of Damped AC Voltage While Conducting Simultaneous Three-Phase Partial Discharge Test on 10kV Distribution Cable

The 10 kV distribution cable is extensively used in urban power grids; however, minor defects introduced during the production, construction, and operational phases can lead to partial discharges within these cables. Such discharges significantly compromise the safe and stable operation of the distribution system. Currently, damped AC voltage technology is widely used on-site to detect and locate partial discharge defects in 10 kV distribution cables. With the growing demand for improved efficiency in operation and maintenance, researchers have begun to explore the simultaneous detection of partial discharges across all three phases of distribution cables using damped AC voltage testing systems. The power demand characteristics required for simultaneously detecting three phases are influenced by various factors such as load capacity, insulation resistance, and more. Therefore, this paper analyzes the power characteristics required for simultaneous damped AC voltage testing of three-phase 10 kV distribution cables through simulation. Initially, the working principle of DC charging damped AC voltage is introduced. Subsequently, a Simulink simulation model is constructed based on this principle. The simulation encompasses various scenarios, including single-phase testing, three-phase simultaneous testing, and three-phase simultaneous testing with reduced insulation resistance due to defects. The analysis yields critical data, such as the charging voltage applied to the tested cable, the damped AC voltage waveform, and the charging current from the power supply. Additionally, the study calculates the required boosting time and the power demand characteristics for the three-phase simultaneous test under these conditions, as well as the energy consumed during these scenarios.

Authors

Institutions

Publication Details

Published
2024-10-18
DOI
https://doi.org/10.1109/icpea63589.2024.10784520
Primary Topic
High-Voltage Power Transmission Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Power of Damped AC Voltage While Conducting Simultaneous Three-Phase Partial Discharge Test on 10kV Distribution Cable

Zeli Ju, Weisheng He, Dang Wenqiang, Zhé Hóu et al.
High-Voltage Power Transmission Systems
article

Research on Power of Damped AC Voltage While Conducting Simultaneous Three-Phase Partial Discharge Test on 10kV Distribution Cable

Zeli Ju, Weisheng He, Dang Wenqiang, Zhé Hóu, Yan Yuan, Yun Xiahaoyue
article en

Abstract

The 10 kV distribution cable is extensively used in urban power grids; however, minor defects introduced during the production, construction, and operational phases can lead to partial discharges within these cables. Such discharges significantly compromise the safe and stable operation of the distribution system. Currently, damped AC voltage technology is widely used on-site to detect and locate partial discharge defects in 10 kV distribution cables. With the growing demand for improved efficiency in operation and maintenance, researchers have begun to explore the simultaneous detection of partial discharges across all three phases of distribution cables using damped AC voltage testing systems. The power demand characteristics required for simultaneously detecting three phases are influenced by various factors such as load capacity, insulation resistance, and more. Therefore, this paper analyzes the power characteristics required for simultaneous damped AC voltage testing of three-phase 10 kV distribution cables through simulation. Initially, the working principle of DC charging damped AC voltage is introduced. Subsequently, a Simulink simulation model is constructed based on this principle. The simulation encompasses various scenarios, including single-phase testing, three-phase simultaneous testing, and three-phase simultaneous testing with reduced insulation resistance due to defects. The analysis yields critical data, such as the charging voltage applied to the tested cable, the damped AC voltage waveform, and the charging current from the power supply. Additionally, the study calculates the required boosting time and the power demand characteristics for the three-phase simultaneous test under these conditions, as well as the energy consumed during these scenarios.

Chongqing University of Posts and Telecommunications (CN), State Grid Corporation of China (China) (CN), Xi'an Jiaotong University (CN)
Affordable and clean energy
Openalex Percentile: Top 78%
High-Voltage Power Transmission Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.