ANALISIS BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT UNTUK KEBUTUHAN TENAGA KERJA (Studi Kasus Pada Staff Produksi Di PT. Kampung Coklat)

This research was conducted from February to March 2023 which coincided with PT Kampung Chocolate, Plosorejo Village, Kademangan District, Blitar Regency, East Java. This study aims to describe the organizational structure and number of employees in the chocolate production division in PT Kampung Chocolate. Conducting workload analysis on the number of employees in the production department using full time equivalent analysis. In this study, a quantitative descriptive research method is used, which conducts a research approach by utilizing numbers that are then analyzed. Full time equivalent analysis is a method that calculates workload based on working time. This labor relationship analysis research obtained two conclusions this study was conducted on the definition of production which has a production staff of 17 employees and is divided into 6 divisions. in each division is already in the normal FTE Index and the manpower needs are in accordance with the normal FTE results

Authors

Institutions

Publication Details

Journal
Grafting Jurnal Ilmiah Ilmu Pertanian
Published
2024-09-30
DOI
https://doi.org/10.35457/grafting.v14i2.3678
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALISIS BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT UNTUK KEBUTUHAN TENAGA KERJA (Studi Kasus Pada Staff Produksi Di PT. Kampung Coklat)

Dewi Indah Sekartadji, Tri Kurniastuti
Grafting Jurnal Ilmiah Ilmu Pertanian
Management and Optimization Techniques
article

ANALISIS BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT UNTUK KEBUTUHAN TENAGA KERJA (Studi Kasus Pada Staff Produksi Di PT. Kampung Coklat)

Dewi Indah Sekartadji, Tri Kurniastuti
article en

Abstract

This research was conducted from February to March 2023 which coincided with PT Kampung Chocolate, Plosorejo Village, Kademangan District, Blitar Regency, East Java. This study aims to describe the organizational structure and number of employees in the chocolate production division in PT Kampung Chocolate. Conducting workload analysis on the number of employees in the production department using full time equivalent analysis. In this study, a quantitative descriptive research method is used, which conducts a research approach by utilizing numbers that are then analyzed. Full time equivalent analysis is a method that calculates workload based on working time. This labor relationship analysis research obtained two conclusions this study was conducted on the definition of production which has a production staff of 17 employees and is divided into 6 divisions. in each division is already in the normal FTE Index and the manpower needs are in accordance with the normal FTE results

Grafting Jurnal Ilmiah Ilmu PertanianVol. 14(2)
Universitas Islam Balitar (ID)
Openalex Percentile: Top 59%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.