Integrating Lean Processes and Engineering Discipline into Work Culture Over 20 Years: An Experience Report

The paper presents an experience report for Don't Panic Labs (DPL), a software and consulting company, outlining the cultural shift in building software using lean processes and engineering principles over 20 years. The shift was intentional due to failures of prior projects. Challenges are identified along with opportunities to address them. An evolution of the company culture is explained via themes that were incorporated chronologically over time, which resulted in reducing errors in judgment, leading to reliable and predictable successes. Two factors, namely, the percentage of rework and co-creation sessions for efficient iteration of requirements, stand out as significantly impacting project success. Lessons learned with discussion and impact to the profession and education are presented.

Authors

Institutions

Publication Details

Published
2024-10-06
DOI
https://doi.org/10.1109/icsme58944.2024.00083
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrating Lean Processes and Engineering Discipline into Work Culture Over 20 Years: An Experience Report

Doug Durham, Bonita Sharif
Quality and Supply Management
article

Integrating Lean Processes and Engineering Discipline into Work Culture Over 20 Years: An Experience Report

Doug Durham, Bonita Sharif
article en

Abstract

The paper presents an experience report for Don't Panic Labs (DPL), a software and consulting company, outlining the cultural shift in building software using lean processes and engineering principles over 20 years. The shift was intentional due to failures of prior projects. Challenges are identified along with opportunities to address them. An evolution of the company culture is explained via themes that were incorporated chronologically over time, which resulted in reducing errors in judgment, leading to reliable and predictable successes. Two factors, namely, the percentage of rework and co-creation sessions for efficient iteration of requirements, stand out as significantly impacting project success. Lessons learned with discussion and impact to the profession and education are presented.

University of Nebraska–Lincoln (US)
Decent work and economic growth
Openalex Percentile: Top 63%
Quality and Supply Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.