ESTIMATION OF INITIAL RESERVOIR PRESSURE BASED ON A «SHORT» PRESSURE BUILD-UP FOR LOW-PERMEABILITY FORMATION

The paper proposes an approach for estimating reservoir pressure in newly drilled zones with low and ultra-low reservoir permeability (1∙10-17 – 1∙10-15 m2). Under such conditions, traditional types of well-testing are not carried out. This approach consists of a short shutdown of the production well for testing to restore bottomhole pressure after its short operation. The method is an analogue of the classical well-testing using the pressure build-up method, but has the advantage of a short well shutdown time. The name of the research method under consideration is a «short» pressure build-up. The proposed method does not require significant research costs and can be applied to all types of well completions, while significantly reducing production losses compared to the traditional method. The paper describes an algorithm for conducting research using this approach. The results of modeling «short» pressure build-up for various well operation scenarios and reservoir parameters are presented. Based on the modeling, a matrix of applicability of the method was constructed, which allows one to estimate the required duration of the study and the relative error of the resulting reservoir pressure. The defining parameter is the ratio of the volume of injected fluid during hydraulic fracturing to the volume of fluid taken during the period of well operation before stopping for testing. The proposed method was tested on field studies, based on the results of which the values of reservoir pressures and their reliability were determined. Materials and methods of the study: flow rate and bottomhole pressure measurements, information from reports on hydraulic fracturing; interpretation of the conducted «short» pressure recovery curves, modeling of the study in the RN-VEGA PC.

Authors

Publication Details

Journal
Problems of Gathering Treatment and Transportation of Oil and Oil Products
Published
2024-12-19
DOI
https://doi.org/10.17122/ntj-oil-2024-6-104-118
Primary Topic
Hydraulic Fracturing and Reservoir Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ESTIMATION OF INITIAL RESERVOIR PRESSURE BASED ON A «SHORT» PRESSURE BUILD-UP FOR LOW-PERMEABILITY FORMATION

А.Н. Ефремов, V.P. Miroshnichenko, N.A. Makhota, A.Ya. Davletbaev et al.
Problems of Gathering Treatment and Transportation of Oil and Oil Products
Hydraulic Fracturing and Reservoir Analysis
article

ESTIMATION OF INITIAL RESERVOIR PRESSURE BASED ON A «SHORT» PRESSURE BUILD-UP FOR LOW-PERMEABILITY FORMATION

А.Н. Ефремов, V.P. Miroshnichenko, N.A. Makhota, A.Ya. Davletbaev, D.R. Yulmukhametov, Yu.O. Bobreneva, A.V. Sergeychev, G.A. Shchutskii
article en

Abstract

The paper proposes an approach for estimating reservoir pressure in newly drilled zones with low and ultra-low reservoir permeability (1∙10-17 – 1∙10-15 m2). Under such conditions, traditional types of well-testing are not carried out. This approach consists of a short shutdown of the production well for testing to restore bottomhole pressure after its short operation. The method is an analogue of the classical well-testing using the pressure build-up method, but has the advantage of a short well shutdown time. The name of the research method under consideration is a «short» pressure build-up. The proposed method does not require significant research costs and can be applied to all types of well completions, while significantly reducing production losses compared to the traditional method. The paper describes an algorithm for conducting research using this approach. The results of modeling «short» pressure build-up for various well operation scenarios and reservoir parameters are presented. Based on the modeling, a matrix of applicability of the method was constructed, which allows one to estimate the required duration of the study and the relative error of the resulting reservoir pressure. The defining parameter is the ratio of the volume of injected fluid during hydraulic fracturing to the volume of fluid taken during the period of well operation before stopping for testing. The proposed method was tested on field studies, based on the results of which the values of reservoir pressures and their reliability were determined. Materials and methods of the study: flow rate and bottomhole pressure measurements, information from reports on hydraulic fracturing; interpretation of the conducted «short» pressure recovery curves, modeling of the study in the RN-VEGA PC.

Problems of Gathering Treatment and Transportation of Oil and Oil Products(6)
Openalex Percentile: Top 76%
Hydraulic Fracturing and Reservoir Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.